'We're off to good start': Winnipeg’s $155 million road construction underway
Posted May 10, 2023, 1:49 PM UTC
Posted May 10, 2023, 1:49 PM UTC
You know construction season has started when all of a sudden I have to drive through 3 separate construction zones to get to work.
With literally no actual construction taking place
My favourite part is Grant is under construction and now they’ve gone and ripped up Taylor from Stafford (also still ripped up) to Pembina…. And closed the westbound traffic. What a cluster f that is.
Grant from Stafford to Taylor should be completed by next week according to the City's road closure site, at least. They seem to be working incredibly quick as compared to previous years.
Ran into the Taylor and Grant stuff yesterday. Very well thought out planning 👏👏👏👏👏
It's masterful in its ability to screw up multiple major routes throughout the city.
It's impressive how fast these projects have rolled out in the last week, and at least along the routes I take it seems like things are moving quickly. It did make me download Waze again to see if I can find alternative routes.
It's really challenging trying to get out of South Osborne to anywhere else in the city though, which is a real bummer.
When the neighbourhood only has 3 vehicular entry points and 2 are under construction certainly makes it a challenge.
And the city has no situtiational or route awareness and promptly blocks/does construction on all thoroughfares/routes through a given area at the same time instead of staggering them.
I was surprised about a week ago by seeing (at least) cleaning crews ACTIVELY working past 11 pm on a weekday
Gilli looks poised to outroad Bowman.
This has been the first time in about three years I have had to working in the city or a shift or two which makes me feel bad for all of you that have to deal with it. Thankfully i start before and end after the rush of traffic but how come the city doesn’t continue work throughout the night?
Most repair contracts only have a required start date or they are penalized, but have no real end date to worry about. That is why they rip up so many locations and once ripped up those locations won't be worked on again till the company has the staff and time.
Ahhh summer is here...
[removed]
I had to do a short errand yesterday...well should have been short. Quick observations on my trip:
It is a complete nightmare trying to get anywhere south of downtown. And I get that the work needs to be done, but it certainly says something when we're spending this much money on roads and the end result is that it's impossibly miserable to drive 6 months of the year and then once that's done everything else is just falling apart.
Winnipeg needs to pivot to massively improving other methods of getting around fast, or we're heading straight to miserable city bankruptcy-ville.
EDIT: Also, as far as I could tell, none of the lights had durations changed to account for the reduced through flow due to closed lanes, so literally half as many cars, at best, were getting through the green in some of these spots. Just terrible.
Everything else is falling apart, and what gets repaired immediately falls apart.
We better not have to pay for those roads to be repaired next year >.>
I believe most, if not all, capital works road projects are covered by a warranty. If you see them making repairs after the completion, that's just warranty work at the expense of the contractor.
I haven't seen repairs being done on the north 59/101 interchange. Just lots of shitty patches of asphalt.
But, that's the province's issue. Not the city.
I'm just guessing but didn't that fully open up last fall after the completion of the floodway bridge? Perhaps, like winter potholes, they just temporarily patched them and plan to go back to make final repairs this summer.
Let the games begin.