Drafting 101: only describe information once, in the most accessible and useful place. If you need to refer to it again, do so in a way to locate the detailed information.

The sparkies will want to see it with the lights.

48
TheDarkestCrownArchitectural Enthusiast :sloth:•

As a design student, this helps a lot. Thanks!

Anywhere I can learn better drafting standards? I’m slowly going through Francis Ching books currently

3
metisdesigns•

I strongly reccomend the book drafting for the theatre. It covers alot of the principles but focuses more on the intent of communication than other options.

2
TheDarkestCrownArchitectural Enthusiast :sloth:•

Thank you

1
ArchDan•

Drafting standards depend on a country you are working on. Most have some Germanic base but in the end they differ slightly.

I tend to split my documentation in 2 ways "gotta be made" are described in floor plan or details and "gotta be bought" which are nicely organised in legend with type, serial number, dimensions and reference to technical sheet.

If something has to be made, they need a recipe (thus drawing), but if they have to buy it, then the grocery list. To make a cake, you need both.

1
TheDarkestCrownArchitectural Enthusiast :sloth:•

Thank you. I’m in Canada so we tend to follow USA standards from what I understand, but we use metric and imperial, not just imperial

1
MoparShepherd•

Is your “grocery list” then just a standard table of columns and rows ?

1
ArchDan•

Depends on what it is.. and what It is about. I work mostly in Revit so it kind of comes with BIM and one has to follow documentation regulations.

But when I designed an office transformer desk yeah. It was just Excel table.

1
pencilneckcoArchitect :snoo_dealwithit:•

Only keynote once.

8
Just-Term-5730•

Looks like a 'finishes, or symbols plan, and/or equipment plan" why arent the switches on an electrical plan? That small of project? If so, there is a chance both these plans are on the same sheet? If so, you are good... if not, typically switches are on an electrical lighting plan. The closest thing an arch has to that is the RCP, so that's were I would go. Plus, no conflicts appear to be on that wall. (Perfect plans do not equal perfect results... 😞 )

7
GumpyPlumpyOP•

That first plan is a remodel floorplan. It’s a hotel remodel project. I just thought it would be easier for the GC to look at seeing the switches and lights on the same plan instead of going back and fourth between the floorplan and the RCP.

Yes, I have a remodel, FF&E, and RCP all on the same sheet. No reason not to be.

3
Just-Term-5730•

Old rule of thumb: show things in one location only to avoid having conflicts. But, with modern software, it's about 'layer management' or whatever turn you want to call it in Revit. Regardless, I still try to follow that old rule.

7
metisdesigns•

That very much appears to be AutoCAD.

1
Just-Term-5730•

Pre AutoCad approach. A lost time when contractors coordinate, as they as still required. So much for industry standaed documents.

1
ArchitecktonArchitect :snoo_dealwithit:•

Whether this is commercial or residential, it looks like you don’t have enough electrical outlets. I count a couple areas where it looks like the outlets are more than 12’ apart.

3

Commercial doesn’t require outlets every 12’ like residential does.

1
hyperpopforever•

It’s a meeting room. Per NEC if the meeting room is over 215SF you need to provide a receptacle every 12’ along the wall. That being said the NEC allows for them to be located at the electricians discretion. Essentially you need to find the linear length of the walls and divide by 12. That’s how many receptacles you need along the walls. It looks like they have it covered. Also the two floor boxes and floor receptacle top right helps as well

1
WildQuiXoteArchitect :snoo_dealwithit:•

Note it once, and fit the note in the bubble.

3
Xilbert0•

One keynote and ad a "typ".? You have a symbol key I believe.

3
Dirtdancefire•

No. One place only. During updates and changes, you will forget to update the other page.

2
mrhavard•

Try to avoid keynoting the same item on multiple places, it helps to reduce conflicts in your plans.

2
Lonely_Ad_1897Architect :snoo_dealwithit:•

This has nothing to do with anything but that font is hurting my eyeballs

1
ZardywackerArchitect :snoo_dealwithit:•

You've stumbled on a topic that has no best answer. I've been in friendly "shouting matches" over this at two different firms. Designers have strong opinions.

Best answer I can give, which comes from all those discussions: It depends on the scope of your design services and the type of contract/GC-Owner-relationship.

If the electrical engineer is under your contract and the GC carries the electrician, I usually do a separate "electrical and lighting RCP" where I duplicate what my electrical engineer shows on their drawings but give locations (dimensions); I also duplicate the graphics for cabinetry and furniture layouts in this plan.

In other cases, use your best judgement. This looks like a residential project and I'm going to assume (maybe incorrectly) that it is more of a builder's set. If that is that case, I would tag them in the floor plan, since that is where other trades will be looking and where you would show circuit breakers, thermostats, etc in relation to framing and furniture. It could just as well go in the RCP though, just know that non-electric trades may miss it there. If you are doing circuit arcs, then obv it has to go in the RCP with the lights.

Hope that helps >:)

1
notorious13131313•

I find this drawing style to be so unnecessarily confusing, especially on the rcp. Super hard to tell the difference between lights/ceiling mounted items and the keynotes themselves. Some lineweight differentiation would help.
I would only show the switches on the rcp and keynote them there.

1
GumpyPlumpyOP•

The RCP looks like shit because I took a picture of my monitor, but when printed there’s plenty of lineweight differentiation. There’s also a symbols legend on the sheets for the keynotes, so if someone thinks a circle keynote is a light or ceiling fixture, they’re bad at reading plans.

1
notorious13131313•

It’s easy to figure out after a minute but it just looks sloppy in my opinion. Also dimensioning something to the cl of the table below, which will not be anywhere on site when the lights are being installed, is not the best way to do it. It’s also slightly to the left of center on the ceiling tiles.

1