Academic_Guava_4190Blue Line•

Happy Sumner Tunnel re-open weekend to all who celebrate!

47
ZippityZooZaZingZoDIRTY FUCKING TRAITOR•

We made it!

1
JocularityX2•

You could eat dinner off that tunnel - it's gleaming!

1
Maxpowr9Metrowest•

Healey didn't say it was "under budget" :(.

1
slicehyperfunkWiseguy•

It looks like... the Sumner Tunnel!

1
-Chris-V-•

I'll believe it after my first trip through.

1
Vespaeelio•

Hopefully the ceiling won’t start falling apart.

1
mgzukowski•

How long do you think before a ceiling tile falls off and kills somebody?

1
ahechtOP•

There aren't ceiling tiles anymore. It's all welded steel plate now.

1
mgzukowski•

That doesn't mean the welds were done properly, or that it's support structure was secured properly.

1
tomdobs55Outside Boston•

Oh excuse us then, how long before a welded steel plate falls down and kills someone?

1
Victor_Korchnoi•

Idk, but I bet a driver kills somebody well before then.

1
tomdobs55Outside Boston•

Very true

1
RickWest495•

They never had tiles on the ceilings. TW had huge multi ton concrete panels suspended by thin non galvanized hangers epoxied to the ceiling. What could go wrong next to a salty ocean?

1
mgzukowski•

It was a reference to the Big Dig where the tile fell off and killed someone.

1
RickWest495•

Yes. It wasn’t actually a tile. It was a concrete panel. Incredibly stupid design. I toured the project around that time.

1
tacknosaddle•

Incredibly stupid design.

Like a lot of tragic accidents it was the result of an accumulation of a lot of small problems from design through installation and with aging rather than a single fault with the design that should have been obvious when it was planned.

1
WickyWickyWhack•

Sweet. Can’t wait to ride my blue bike through it

1
RickWest495•

The walls look the same as when they closed. The original plan said that the walls were supposed to be done by June 23. Then the ceiling by August 31, 23. Then they do the bottom in July and August 24. Now they say they are closing it for 8 weekends during the next few months. So, did they really meet their deadline?????

1
ahechtOP•

Not sure where you got those dates from, but the latest info on the summer closure was that they were going to:

  • Restore the overhead arch and ceiling
  • Paint interior tunnel walls and add fireproof boards
  • Install new lights inside the tunnel
  • Install new utility conduits and cables
1
RickWest495•

Quoting the original plan when they were going to close it for 4 months from May to August and donor all at once. They adjusted the plan later and split it into two parts. The original total completion date was August 31, 2023.

1
Torch3dAce•

What exactly did they upgrade or fix??

1
ahechtOP•

They repaired the crumbling cement on the ceiling and reinforced it with welded steel plates.

1