Bury old retaining wall?
QUESTION: Has anyone done anything like this and experienced any negatives?
I need to replace a 37-year-old treated pine retaining wall. (Cut and fill block. The house is on the built up section, about 1.5m from the retaining wall).
A builder and an architect suggested just building a new wall in front of the old pine wall, and then removing the top row of pine and burying the rest of the old wall under the backfill.
This saves a lot of work of course and because it's a repair supposedly I won't need any council approvals etc (the wall is 1m at the highest point - so normally would).
Good, bad, doable as DIY with engineering plans?
Posted Nov 23, 2023, 5:17 AM UTC
Really depends on what state you are in. My council area you can build a 1m retaining wall without permission or engineering. But if you are repairing more than 20% of an existing wall then you do need approval. It's very common for people to build Infront of an existing wall.
NSW. Interesting about the 20% rule. I'll look into that - thanks.
Yeah I don't get it personally. I think in NSW anything over 600mm needs council approval. Not sure if building a new wall is classed as a repair though. Probably best to talk to the council under the name Mr Smith.
I know someone that built a 2m retaining wall he had engineered but didn't go through getting approval but still has the engineering plans if shit ever hits the fan.