Five days later and Metrolinx is still running full-page banner ads telling us how quickly the Ontario line will get us to the Science Centre

Posted Jun 26, 2024, 12:20 PM UTC

Posted Jun 26, 2024, 12:20 PM UTC
They mean "Science Centre Condos Project"
You mean the condo project that has "proximity to the science centre" EVERYWHERE in the marketing?
The Cross town project has always included the science centre proximity as to why it's going to be a great community.
Phil Verster, CEO of Metrolinx isnt even Canadian. He is a privileged South African national who makes upwards of $900,000 a year on TAXPAYERS MONEY.
He has accomplished a boondoggle of a construction project that has virtually no cap for money. He has wasted money, made constant mistakes, and is the first to point a finger.
If this weren't corrupt butt buddy politics with L.Ron Ford, Versters shit work would have him fired.
Who cares if he’s Canadian lol. He lives and works here
Hes never ridden transit here. Hes never understood what working class people need. He has never been poor and relied on public transit.
He is tone deaf. He has no solutions, he collects an exorbitant salary as a public servant. He collects nearly a million in base salary- and his performance has been dismal at best.
He is a member of the elite class of ignorant decision makers, and is not accountable to his countless follies.
If accountability were important, he would be gone. And replaced by someone who is actually familiar with Canada, especially Toronto and the GTHA. It's not about being Canadian. It's about UNDERSTANDING Canadians. He has no fucking clue.
You can make the same argument against any politician in this country.
Bet. We need a different federal, provincial leader I might add!
The rot goes way up. Mr Verster is just a pawn playing by the rules of his corrupt masters
CEO pay is stupid, that's the issue. They do not need to be earning more than twenty times more than their base employee.
Yeah but does it matter if they’re born in Canada though?
Wasn't aware that was a factor in hiring.
L.Ron Ford
LOL.
Cleary they’re referring to the coincidentally named station and not “The Science Centre” /s
these ad spaces are paid for months in advance sometimes.
Except that Ford had been planning to close the Science Centre for years, as part of ginning up a business case for gifting a giant underground parking garage to his Ontario Place spa.
So even before last week's abrupt and premature termination of the Science Centre the ad was bullshit.
except that's not how metrolinx works.
Based on traffic, that is the actual travel time between Exhibition station, and the new science centre location.
Or by walking.
Nice that metrolinx thinks you can walk across all those parking lots in 30 min, guess they don't think too highly of the transit they are building.
The bigger joke being that it was announced the Science Center was moving almost immediately after the Ontario Line was locked in, and with how fast Ford's been pushing to tear down Ontario Place the move will probably happen well before the Ontario Line is done. This advertising is bullshit all the way down.
Metrolinx has been rinsing taxpayers, the Eglington line has cost about 20x the amount that even the TTC union could have done it for.
They just covering their asses when SC will be build at exhibition grounds and it still take us 30min to get from one to other.
Take what I say with a grain of salt but I hope Doug Ford stubs his toe twice a day for the rest of his life.
I mean, if you walk real slow, it could take 30 minutes to get to a Science Centre that will be in proximity to the Ontario Line at some point.
How fast cane the Eglinton crossto….. nevermind.
Their new campaign: If you don't drive, get fucked!
Well Leary stepped down, how about Verster next.
Ha ha this is comical
This is great! 30 year wait for it to open (with it being $30bn over budget) then just 30 more minutes to the science center, can't wait 😁
Guess the infrastructure office didn't send out a memo about the change. Clearly shows how little thinking went into putting the fences up.
I mean it was such a fast closure. For a government that can take years to put up a stop sign at an intersection, they took hours to close a monumental attraction
Those things are done by two different levels of government. The stop sign is not the provincial government.
Disgusting. Mike Crawley just came out with a. Story that shows many Ontario Govt building use the same roofing material as the Science Centre, yet only the Science Centre is closed. 💯Dough Fraud corruption.