CRWG implementation briefing 5/14
##Phase 1
###CRWG MOU Section 1: Implementing 2023 CRWG #s in FY25 Controller Workforce Plan
- Staffing Workbook already implements new #s — no phased approach
- Today’s weekly PPT will also implement new #s
- Effective today, ALL movement (NCEPT, NEST, AAC placement, etc) implements new #s
- Appendix 1 includes Watch Supervision Add-On as well as 2023 CRWG #s. Add both together to get the #s that will be shown in FY25 CWP. This sum will also be used for all movement.
- Appendix 2 has CRWG MOU recommendations — these come from a separate workgroup, too broad to implement now but will be addressed in quarterly meetings and try to implement once data is available
###NRP MOU
-
PPT is still controlling document for GAINS
-
New tool controlling for LOSSES: 12-month Expected to Target Tool
-
In order to release: Current % to target at least 80%, ETT at least 85%
-
Release dates no longer use Categories. Rather: Release date is 1st month where ETT shows 85% or greater (no earlier than 3 months, to allow for HR processes; no later than 12 months)
-
At employee request, release dates may be extended up to 2 PPs
-
Other Than Controller Workforce deviation process will match above
-
Parties will meet quarterly to review/evaluate process
-
Data source for ETT: Historical cert times, years to train, success rate, SWB
- EXAMPLE: Facility has 18-month historical cert time. After six months at facility, a trainee will appear at the very end of the 12-month ETT, and stay at that date in further ETT runs
-
Granular data allows reduction of release thresholds and less risk of a “dip” between someone leaving and their replacement arriving/certifiying
-
If trainee does not certify by ETT projected date, will pull from SWB to see where trainee is in training (not super clear how this is evaluated)
NOTE: Release date depends on SUSTAINED 85%+ ETT — if you hit 85% and then drop back again (due to expected loss), release date waits until ETT reaches 85% again
For releases: No longer looking at Finance expected “retirements and other losses”
###NCEPT
- Terminal facilities will gain up to 100% Projected to Target
- EnRoute will gain up to EnRoute Natl Avg + 5%. For May 2025, this number is 88.9%
- This is because every single EnRoute facility receives AAC placements
- If a facility is eligible to gain 20 or more, they will make two selections at once in Round 1. In subsequent rounds, will pick up one per round
- After Round 1, remaining gains will be to 8 and below tower-only facs IF training time is less than one year — up to 100%+1
- Unclear if this means no 9+ will select in Rounds 2+, or if it just means gains increase for 8- in Rounds 2+
Additional NCEPT SOP changes/mods:
- Selections made in accordance with release policy as described above
- Releases stop after facility drops below 85% ETT
- Round 1: Only BUEs that are fac-certified for one year
- Special focus on AUS, DCA, ZAB for now
- Priority list (decision lens) modified to prioritize facilities that don’t receive AAC placements
- May still see AAC-placement facilities for the first couple NCEPTs as things settle
##Future/Phase 2
- Non-standard rules will be evaluated each time
- Remove Article 124 from NCEPT — allow them direct movement at any time
- TOL SWB attribute — better granularity
- Composite Score Generator — remove Manager’s Ranking List (!!!!), put emphasis on individual’s work history
Future Recommendations
- Off-cycle lvl 9 and below
- Improve ERR filing (AVIATOR/USAJOBS)
- Update MOU/SOP
- NEST
- S804
##Closing thoughts Direct questions to NATCA/FAA leadership Stagnation may occur immediately post-implementation; should improve later Don't go to message boards with questions
Posted May 14, 2025, 2:37 PM UTC