Boss insisted on tracking “every single task.” So I include “adjust chair” and “blink.” Individually. For two weeks.
My boss decided we weren’t being “transported” enough with our time. New policy: log every single task we do, no exceptions.
So I did.
• Log in
• Open Outlook
• Adjust chair
• Blink
• Sip water
Scroll one line Each logged. Separately. Repeatedly.
After two weeks, he pulled me aside. “Why is your log 17 pages”
I said, “You said every task. These are the task.”
The next day, the policy quietly change to “track key deliverables only.” RIP, blink log. Gone but not forgotten.
Posted Jun 16, 2025, 9:54 AM UTC
615