CoreTek Alabaster Oak looks patchy. The subcontractor opened one box at a time. What should I do? I don’t like the look. Also, what do you put on the edge. I think my contractor wants to nail down some wood edge and paint it. Doesn’t that defeat the purpose of the floating floor?
reddit.com/gallery/1ph2c6mPosted Dec 8, 2025, 3:44 AM UTC
046