Ahmet

NSFW

I need a technical cross-sectional illustration of a TBM (Tunnel Boring Machine) tunnel for use in a construction method statement.

The drawing should include:

  • A circular TBM tunnel with segmental lining (precast concrete segments) clearly shown
  • The excavation diameter and the annular gap between the segment lining and the excavation boundary clearly indicated
  • The annular gap should be labeled (e.g., “Annular Gap”)

Additionally, I want to show a ground improvement application using our product called “DeepSoil”:

  • Injection should be illustrated from inside the tunnel, through the segment lining, towards the annular gap and surrounding ground
  • Injection points should be located at 10 o’clock, 12 o’clock, and 2 o’clock positions
  • Arrows must clearly indicate injection direction from inside → outward (not from outside inward)
  • The injected material (DeepSoil) should be visually represented filling/improving the ground around those مناطق

Style requirements:

  • Clean, engineering-style technical drawing (not artistic)
  • Clear labels and readable annotations
  • Preferably a cross-section view with good depth perception

Posted Mar 26, 2026, 11:36 AM UTC

10
Loading comments…