How feasible would a geothermal plant/data center be?
The idea behind it being after the steam or what ever fluid is being used to spin the turbine at the geothermal plant is cooled that liquid is pumped to the data center to cool the chips which is then sent back down underground cycle back through the geothermal plant, at least thats the idea
Posted May 24, 2026, 2:55 AM UTC
09