Grading side of the house.
I need to re-grade one side of my house, water is pooling right next to the foundation. I have my AC in the area that needs to be graded as well. I think the length that needs to be graded is about 15-20 feet maybe.
Any company recommendations would be really appreciated. Unfortunately, I don't have the time to do it myself.
Posted Sep 14, 2026, 7:54 PM UTC
83