[Charter] If anyone is familiar with the construction process, a question

Hey all. About this time last year, I happened to find an excellent deal for a Foreclosed house. Not in -terrible- condition and was only about 75k in a 140-150k neighborhood. Nice little subdivision, very quiet, seemed like a steal.

Well, my first warning was that the Charter website said no services were available. A bummer, I figured, but I'd just look into AT&T. Also no services (which I know is a lie, because there's AT&T pedestals everywhere in the neighborhood which are leftovers from ATT's acquisition of Bellsouth. I'm guessing they would rather just push their Satellite affiliates then actually deal with adding more customers to their pitiful DSL.) Needless to say, not having internet was a huge deal breaker, so I went into the local Charter office to inquire, fully intending on backing out of the house sale if they gave me a bad answer.

Well, according to the computers at the front office, the neighborhood was serviceable. They couldn't explain why the website showed a negative answer, but they said it should all be good and signed me up for an installation date the day after closing. Worst part is, I drive on out to the neighborhood and see an old man mowing his lawn and go ahead and ask him if the Charter reps are telling the truth. He says that he's pretty sure that some neighbors have Charter, but he himself doesn't. It's on me for not following up better, but I accepted that between the Charter desk and the guy living in the neighborhood, I was pretty safe. This was my first house, first time moving away from my parents. I didn't stop to think why there were no Charter pedestals in the neighborhood. Why would two separate entities lie to me?

Well, I closed on the house and the next day a Charter contractor pulled up to give me the bad news. Nothing he could do, nothing in the neighborhood. He promised to put in a ticket to have a surveyor come out and figure out what's going on. He must have been true to his word, because sure enough, the surveyor showed up later in the afternoon and confirmed that although there was Charter lines set up on the telephone pole out in front of the subdivision, they didn't have a footprint inside the neighborhood. They closed my ticket.

I fought as hard as I could, though. I submitted a formal complaint to the FCC and that prompted Charter to send out another surveyor. It must have been my lucky day, because that surveyor's statement said that the neighborhood was an excellent opportunity and recommended building a network. Charter agreed and told both the FCC and I that the build would be completed in the first quarter of 2016. I figured I could tough out a couple months without internet or TV.

The first quarter rolls around and I attempt to get in touch with Charter, and eventually get the number of the construction manager in charge of the build. Super helpful guy, very nice, but unable to give me a ton of information other than vague things. He tells me that they've got the build drawn up and are waiting for funding and then they'll start.

As you can expect, merely from the fact that I'm telling you my own personal sob story, I do not have service. To his credit, the construction manager encouraged me to keep calling back for information, though I don't want to piss him off by being a best. Throughout the past 9 and a half months, I've been calling him every 2-3 weeks to get whatever update I could. Finally, in June, there's spray paint markers all over the neighborhood and in late June, a contracted work crew began installing stuff.

But, despite the fact that there's now a bunch of Charter pedestals around the neighborhood, nothing is happening. I called a couple weeks ago and the construction guy informed me that they didn't have enough power to power the new build, something which seems like a major oversight given no work was even done for over six months.

So my incredibly long winded question is this. Has anyone, employee or customer ever experienced something like this? Anyone know how long these builds usually take? I think I've been incredibly patient, as in the first week of November I'll be 'celebrating' a year of driving over to my mom and dad's house to play some video games or do anything that requires anything more than a mobile internet connection.

The construction guy said the build is 95% done, but if it takes another three months to set up another power source to power the build, I can't take a bunch of comfort in that number. I guess after so long I'm just feeling hopeless and am wondering if anyone has any experience what-so-ever with a situation similar to this.

Figure it's a long shot, but today has been a rough one and I'm feeling a little hopeless about the whole thing, so any information at all is welcome.

Thanks.

Posted Sep 20, 2016, 6:15 PM UTC

16
modusberodus•

Try contacting the power company and putting some pressure on them. They are ultimately going to be the source of any power delays.

1
SoliasOP•

Good idea. I'll reach out to them and see if they can give me any info/timetables.

It was all much easier to be confident about when I could actually see the workers in the neighborhood expanding the cables. It's the uncertainty that's killing me.

Thanks!

1
EndorphinRush•

That's a terrible idea, don't do this. What ever engineering firm was used for the plans did not take into account the loss of power over distance and the resistance on the lines. In short, they don't do math...

Unfortunately I have definitely seen these issues before... e The good news is that if the project has come this far it will be completed. If Charter tells the FCC they are going to build something they will. Getting funding for these projects during a time of acquisition is tough but it will happen.

Cable is pretty simple, AC+DC=RF. What's going to happen is Charter will go back to the engineering firm and teach them to math. Once that's done, they will go back and cut in a new power supply or two to balance the power draw. Then the plant will be activated and swept (amps and line extenders will be balanced). Once that's completed they will send direct sales people to come knocking to get people signed up.

What ever construction contact you have is your best bet. Giving them a week or so in between calls is probably better then most will give so I'm sure they appreciate it. Sorry it's taking so long, but sadly these things do take a while. Lots of moving parts...

Edit: The power company has little to do with this. Once the plans are redesigned with power constraints they will order the needed power supplies. This does include getting a new purchase order. I know in our region they have calls for these thing bi-weekly if I recall correctly. This may vary in other areas. Once approved they will be ordered and installed. Then the power company will be notified to connect. This part is usually fairly quick. The power company isn't going to hold this up and they won't be able to help with a time frame.

2
SoliasOP•

Hey man, thanks so much for the information. So will they be having to bury the power source in the neighborhood or will they do it on the telephone poles?

Appreciate the input so much. Just a little antsy I'm afraid.

1
EndorphinRush•

That depends. Cable follows power, so if power is underground then cable is. This very rarely differs. The power for cable does not come across on separate cables but actually on the hard-line itself. Most cable companies now a day use backup power supplies. Meaning they have a battery backup inside the enclosure.

Alpha is the main supplier of these, and also the power supplies. The styles vary but this is essentially what you are looking for Ariel or pole mounted and Underground or buried cable

Again the styles vary but you get the idea. If it's underground they are usually located within a few feet of a transformer. No reason to run long secondary lines from power. The cable will connect up with this and power will be fed and or back fed to the actives.

Usually a node will not have more then a handful as they have become pretty efficient. So they are so sometimes hard to spot. AKA down the road and around the corner kind of thing.

Edit: a word.