Symington Yards Overpass Construction

Ask Winnipeg

Does anybody know when it's expected that both lanes will open? The overpass has been under construction since spring, yet hasn't seen a construction crew.

Posted Nov 22, 2016, 5:30 PM UTC

114
barkeepjabroni•

It's not much of a construction, but more like a structural issue with the bridge. It may have something to do with the resurfacing work they did last year.

The engineers were inspecting the bridge last year and noticed some problems. So what they did is limit the weight of cars going on the bridge by reducing it to one lane each way.

When they're going to fix it is another story. Nothing in the radar to fix the bridge right now.

9
hillside•

That bridge was damaged in the '80s when a collision caused a locomotive to leave its tracks and take out a pillar. I remember two sections of the bridge sagging. It's been such a long time now, but I wonder if that incident has anything to do with today's problem.

1
barkeepjabroni•

That's interesting. I did not know that!

Perhaps the demons of the past has came back to haunt the bridge. I guess it's time to replace it.

Then again, they haven't replaced a section of the overpass in Portage la Prairie, since it's actually missing, if you ever go down that way on the Trans-Canada.

1
hillside•

Been digging just now. I tried checking the Freep's archives to which I have access, but for some reason I get a big black page instead of what I'm supposed to see.

The only other online mention I found on this event is from a blogger summarizing it in a paragraph:

On December 15, 1983 a trimmer set of locomotives, 214-262 was pulling eight grain loads over the hump from the yard bowl for re-humping. After cresting the hump, the units' brakes failed, causing a runaway, colliding with the B-side hump set under the Trans-Canada Highway overpass. Deflected into the abutment, 214's engineer was killed instantly.

http://tracksidetreasure.blogspot.ca/2012/08/symington-yard-incidents.html

1
barkeepjabroni•

That explains why I get this weird feeling every time I exit off that bridge into Plessis, and driving by the tracks as I go underneath the bridge.

People died around that area. :/

1
coolhotrod•

It's been like that for about a year now. I drive over it every day and haven't seen them working on it at all in the past year. I don't drive under it though, so I don't know if they've done any work from the bottom.

2
gato38•

I've driven under it recently and see no work being done.

2
hiphopsicles•

Its a nightmare for people trying to merge onto it off of Plessis going East. Most people are too dumb to merge properly, so when you combine that with the idiots who try to prevent people from merging, you've got a mess. I may just avoid that route this afternoon.

2
OutWithTheNew•

When the resurfaced number 1 up to it, they neglected to paint in the previous merge lane.

0
codyycvpi2004•

http://www.symingtonscandal.ca

Share... there's a lot more to this story than we all know. Horrible mismanagement of the project, blatant disregard for safety... uncontrollable costs.

2
nizon•

They are working underneath the bridge adding additional supports. The lane closures were to reduce load on the bridge while the work is ongoing. The fact that the bridge spans one of CN's busiest sections of rail in the country kinda puts a damper on progress. I haven't seen a completion date anywhere though.

1
Tjakennedy•

Yes they are working under the bridge and limiting weight by reducing lanes. They are adding massive Structual i beam supports under the older concrete columns. Still have no completion date.

1
[deleted]•

[deleted]

1
BeaveVillage•

Work on this bridge actually only started only in June 2016, but the construction barricades had been up for nearly six months before that. Very scary that if they felt the bridge supports were not adequate for four lane traffic, they would leave two lanes open still.... I wouldn't want that on my head if something went wrong.

The Minneapolis Bridge Collapse should have been a wake up call for all bridge infrastructure engineers, if you need to close the bridge--do it, but don't you dare leave 2 lanes open and then expect the bridge to remain up without issue for years on end without any actual construction taking place. Some trucks go on that thing with way more weight than they may report. The last thing the City of Winnipeg needs, and Manitoba has a whole, is a bridge collapse there.

That said, my source in the Manitoba government expected work to be completed in August of 2016 but did not provide a firm date, that did not happen and now we're entering 2017 with yet another bridge in the Winnipeg area suffering construction rot. (/remembers the South Perimeter Red River bridge under construction for over 5 years, and nothing really got done because they were there over and over again after finishing construction.)

The upper portion of the bridge is dilapidated, the edge fencing does not present an appealing visual to those visiting Winnipeg, and I would recommend the entire bridge be scrapped and replaced, but since this is Winnipeg and there's no other way to cross, get as many construction teams out there as possible and get that thing fixed up asap.

1
codyycvpi2004•

Funny I came across this... I have been monitoring this issue quite closely because frankly it has been pissing me straight off.

I have contacted the government on multiple occasions. I got my first reply from the Executive Director of Structures August 9th, 2016 wherein she indicated that after closure March 12th, 2016, engineering design of the repair and fabrication of components continued throughout March, April and May. She further indicated that repair began during the first week of June and that construction would be complete in mid to late August and was being undertaken as "urgent".

I then escalated to elected officials and received a response from the Assistant Deputy Minister of Manitoba Infrastructure. He stated that coordination with CN Rail had not gone as originally planned and completion date was pushed to "sometime in late fall 2016".

Near the end of November, I made contact once again and the response was yet more vague from the Assistant Deputy Minister: "Work is progressing and will be completed as quickly as possible".

I drove this route almost daily and the gov is feeding me BS without providing any official releases. Surprise surprise.

1
BeaveVillage•

The exact situation I find myself in. My contact in the Manitoba Government keeps pushing the date back. It's very annoying.

Get this thing done. I hope they realize that this is the only way to get into Winnipeg along the #1 highway on the East Side. Taking the Perimeter 100 or 101 highways takes a vehicle way off course if the bridge were to ever be closed or shut down.

This thing needs to be fixed ASAP.