Help need contractor tiling advice..not sure what to do.

I'm renovating my kitchen and bathroom. The previous tile was remove completely to the wood sub board and new rock in the bathroom.

​

I always hear bad stories about home depot so I opted to spend a little more to get better tile with the anticipation of less warping etc. To my surprise, my kitchen looks like a 3D floor and actually looks significantly worse than my inlaws HD tile job. How does this happen? Is this normal? Can a tile guy walk away and say this is good work? I'm not an expert but would be interested to learn how this happens. I

​

The second issue is in the bathroom. Looking at the cuts, the left side of the bathtub area is cut significantly different than the opposite side, both will cover the same width. Is this typically? Shouldn't it be symmetrical?

​

Based on these 2 issues, I am really hesitant to move forward with the tile contractor.

​

Would really appreciate any advice here before things get worse. I feel like I'm paying good money and geting poor quality work.

​

https://imgur.com/a/t8JwvEN

Posted Jul 13, 2019, 12:07 PM UTC

70105
CursedSun•

Picture 1. They installed at a half offset, which is absolutely the worst pattern to do with this type of tile - long rectangular LFT. Laying it in that pattern shows they don't understand best practice (max 1/3 offset, ideally closer to 1/4 or 1/5). They also obviously don't use both SLC + LASH/leveling spacer systems based on their result, or they use them incorrectly. They might not even be using the correct trowel size for LFT.

Pictures 2 & 3. Sometimes tilers will center each wall, sometimes they'll "wrap" the tile around the whole way. It's personal preference and aesthetics imo. I'd rather go symmetrical in this situation. Also, it's a bit of a weird offset pattern once more. Also, usually ideally you don't have the cross spacers on their side unless you need to tweak a line because either you fucked up your level line or the tiles are sizey.

More interesting to me personally is the question of waterproofing for that shower. What system are they using, what products are they using?

I'm an apprentice tiler and I wouldn't be happy at all with putting my name to these pictures. But I'm anally retentive and try to achieve the best possible results.

54
skwolf522•

This guy asks the right questions. I have 9 X 36 wood look tiles and they are offset 25% or 9 ".

This is what it should look like. https://imgur.com/bhvHRPm

​

They should be installing the tile like this

​

https://www.youtube.com/watch?v=Way5bMh-eYg

​

Also shower water proofing is very important, Tile and grout is not water proof. You should be waterproof before they every put the tile on it.

​

What will happen if they don't do your shower properly.

https://www.youtube.com/watch?v=8_ct9igRN4U

18
ten-million•

That last video was painful. The bought all the most expensive material and used it all wrong.

4
skwolf522•

Yes I felt the same way.

2
CursedSun•

"Hey, I've started a tiling project but ran out of time, can you take a look at this job for me and quote how much you'd charge to finish it?"

Walks into bomb site, they've started in the corner with zero care for plumb level or square, it's obvious they've gotten in over their heads and thought eh, I'll just hire a tradie and they'll finish it for half what they'd have charged minus the materials I'll supply since I've done half and we've got the materials here already

Sees container of mostly used mastic in the bathroom with 12"x24"/24"x24"

Walks the fuck away quoting far more than I'd have charged to do the whole job telling them it all needs to be re-done because they've done things wrong from the get go, so that I don't get the headache of dealing with the fuckups and having to explain where why and how they've done EVERYTHING wrong

Actual situation that happened to me a couple of months ago when I got offered a "small side job" through a mate.

2
ten-million•

The first couple of times I walked into a situation like that it took me a long time to figure out that everyone involved in the project before me was partially culpable. How could no one have honest intentions?

Now I see that it’s not so uncommon.

2
[deleted]•

Most of the stuff that contractor fucked up is all stuff you could learn after a day of watching youtube videos or even just following the manufacturer's instructions.

1
scrlk990•

Is that luxury vinyl or is it ceramic? If ceramic, can I have the brand and model? I’ve never seen such pronounced scrapes.

3
WiseImprovements•

Floor and Decor had a tile very similar(maybe that tile) a while back but I have not seen it for a long time. I thought about recommending it but had some reservations because Plano flooring is hard enough to work with as it is haha. On the ones I saw they had uneven edges so I imagined it would make lipping more of an issue.

1
[deleted]•

[deleted]

1
apjayoOP•

Believe its this tile Refin Larix 6 x 30 Sun

1
skwolf522•

ceramic

Marazzi American Estates Spice 9 x 36

​

Local tile shop wanted $6 a square foot.

​

Found it online for 2.20 with shipping it was around 2.60 a square foot.

We ordered extra because it was B stock. But 95% of the tiles where perfect.

1
skwolf522•

You can't see the scrapes in the pictures they post on there websites. But in person it is amazing. And you can see them easy in my pictures.

1
skwolf522•

Master bedroom during remodel.

https://imgur.com/32JtFCh

​

After remodel

https://imgur.com/O5WtkE4

1
apjayoOP•

They installed at a half offset, which is absolutely the worst pattern to do with this type of tile - long rectangular LFT. Laying it in that pattern shows they don't understand best practice (max 1/3 offset, ideally closer to 1/4 or 1/5). They also obviously don't use both SLC + LASH/leveling spacer systems based on their result, or they use them incorrectly. They might not even be using the corre

Appreciate the thorough response. I added an additional photo, its about a 1/3 offset. When I question the contractor his response is that the tiles were curved. Again, I went to a tile store and bought good tile, not just off the shelf HD. Any thoughts on how to counter?

Terms of waterproofing, I don't think there is any to be honest. Its just green board. Is that incorrect as well?

4
DangerHawk•

Carpenter here. I do alot of tile work.

As others have said, and for the same reasons, that floor is garbage. It could very well be because the tile was bowed, butthe contractor should have noticed this on tile number 1 or 2, stopped work and brought it to your attention.

I hate to break it to you, but that whole shower needs to come out. There is no waterproofing like Redgaurd or Kerdi over the tile backer. That shower WILL leak. If the fucked the walls up I'd be willing to bet they fucked the pan up too.

As for the shower layout...is there supposed to be a vertical accent strip to the left of the mixing valve? Also the back wall most certainly ly should ha e been played out symmetrically. The fact that it wasn't is initial stupidity/layzyness on the contractors fault. He didnt want to make two cuts on tiles on the left side. There is no other reason for this.

You MAY be able to save some of that tile by popping them off the walls and scraping them down.

Word of advice for future projects, do NOT use HD or Lowes for any contracting. Their subs are almost universally terrible and need to provide almost zero references/proof of quality work when first hired by HD. All they need is insurance and a license # and literally anyone can get that. Source contractors through friends/family or other contractors that you already trust.

Edit: Also don't buy any sort of Tile from HD. It's all usually terrible. The buy the cheapest brands/models at ridiculously low rates because the need to stock 10,000 stores with all the same shit. Go to a tile store. You may end up spending an extra $1-4 dollars/sqft but the ext re a cost is worth the quality/warranty. You can also ask them for quality contractor refferences.

Sorry for spelling/grammar errors. Sitting on a bucket at a jobsite on mobile lol

11
apjayoOP•

That's what I don't understand, if it looked like shit, why continue? This tile was purchased from a reputable tile shop, wasn't just cheap tile from HD. Even if it was bowed, from readings and youtube, proper spacers, level floor and mortar all play a part and could have minimized the appearance of curves in the tile. Is that about right? I need to build my case back to the contractor.

I think the vertical strip is to hold the tile up in the interim? I really couldn't tell you at this point. Nothing looks symmetric and looks like they just cut as they go, no pre-layout of any sort.

Terms of the contractor, my GC hired him to do the work but everything just looks like shit. He is doing the carpentry work which has been great but the tiling is awful.

Good to know about the waterproofing. Definitely just green board topped with mortar/tile.

8
CursedSun•

That's what I don't understand, if it looked like shit, why continue?

Because that's just what some people do. You don't get paid for time not working due to delays. Sucks, but that's the attitude when they're doing quantity not quality work.

This tile was purchased from a reputable tile shop, wasn't just cheap tile from HD. Even if it was bowed, from readings and youtube, proper spacers, level floor and mortar all play a part and could have minimized the appearance of curves in the tile. Is that about right?

This type of tile can be bowed no matter where you purchase it from, the larger the tile the higher the likelihood. It's to do with how tile is made with modern processes. This video from Sal DiBlasi (very respected setter in the tiling world) will explain dealing with it a bit more/better than I can with text.

I think he's questioning whether or not you're putting mosaic to fill the gap or something.

I'd go back to your GC, and start dealing with him rather than the tiler. It's his job to manage his guys, and this obviously isn't living up to your expectations.

If it's just green board, you'd almost be guaranteed to be pulling that shower down within a decade.

6
loliaway•

Wait. The tile setter is also the carpenter??

5
[deleted]•

[deleted]

2
DangerHawk•

There are processes to combat the bow, but you can only really fix about a 1/16" of bow without it being noticeable. The tiles on your floor look like they're bowed 1/8 to 1/4" which is HUGE. Talk to your GC and voice your displeasure. Ask questions about proper techniques, waterproofing, etc... if he says there is water proofing ask for brand names and get him to put it in writing because he is 100% lying to you.

2

I bought Chinese slate tiles at HD by literally taking apart box after box, combining good with good until I had enough for my job. I had a discard rate of over 60%. Only opted out of a few when I got home and installed, better than returning a dozen boxes though.

1
DangerHawk•

The amount of time that you you spent doing that though could have covered the cost of buying nicer tiles. Say your hourly rate is $60/hr and you spent 2 hrs sorting tiles. You just spent $120 to do manual labor for no reason.

HD is good for tools and construction materials. Finishing materials at big box stores are always terrible (in my professional experience).

1
CursedSun•

Ah shit, I was looking at the "H" pattern rather than actually at the tile, lol.

Yes, these tiles typically do come curved to some degree, it doesn't matter where you buy them from, but you check them by putting two together face to face and checking the gap at the edges. Big gap = no bueno tile.

Basically, I won't touch those tiles without a flat floor (i.e if its not flat, I'm pouring self leveler/smoother and charging for the prepwork if the client agrees). I also won't touch them without the "leveling" spacers. If you use them right, they can actually pull higher sections of the tile tight down into the bed and you can basically get the "uninterrupted credit card slide" level of flatness out of them.

If it's just green board, that's bad. Liquid applied waterproofing membrane should be going over green board and it should be fully tanked up. Although to me it does look more like cement board. Do you have any progress pics from just before the wall linings and just before the tile started going up?

For reference. Green board is "moisture resistant". It's not waterproof. Same goes for cement board. There are waterproof board products out there, they still need sealing at joints and changes of plane. There's multiple ways to waterproof cbu and/or green board. Liners behind the [cbu] walls tied into the pan liner, liquid applied membrane over either board product, sheet membrane applied over board product (with this it's good to check manufacturer spec - some will say do or don't with xyz). Grout and tile are not truly waterproof, at best they're rated as impervious but even that definition still has an allowance of a [miniscule] water transfer rate.

6
skwolf522•

They always blame the tile. It is there responsibility as installers to do a good job. If the tile was bad, why did you install it?

3
loliaway•

Are you sure it's 1/3 offset? I think you would be every 3rd tile before a seam lines up, no t every other....

2
apjayoOP•

I asked for 1/3 as thats what the box and tile shop suggested I use. I added another photo to the link. let me know what you think.

2
loliaway•

Eesh. So it looks like two 36" tiles covers the entire distance that's being tiled, yeah? So what they should have done is a pattern like this:

Full tile|full tile

1/3 tile|full tile|2/3 tile

2/3 tile|full tile|1/3 tile

Full tile|full tile

As well as fixing all the lippage issues.

7
skwolf522•

This looks like half off set, you can see the grout line every other tile. You don't do that with wood look tile.

2
CursedSun•

It's not actually half offset, it's a weird ladder stagger that shifts 33% then 66%. Literally never seen anything like it before.

1
[deleted]•

[removed]

1
crunkadocious•

How should I tile my bathroom with hexes that are like 9.5 by 11 inches? What do I do along the side of the tub, and should it go up to the drywall (greenboard)? Or should the edge be grout?

1
CursedSun•

Preferably on the walls and floors ;)

It depends entirely on what your actual plan for doing the bathroom is. Assuming you're talking tub with shower head, put the wall linings up around (ideally CBU rather than green board but eh, we use green board here). Hang it so it falls over the flange of the tub and leaves a small gap (so moisture can't wick up if any gets in there). Use neutral cure silicone for a bond breaker between that. Liquid applied waterproofing membrane on all walls of the shower enclosure (1' above the shower rose or 6', whichever is the greater measurement), use butyl tape to tie it into the tub. Tile on top, use the correct adhesive. Ideally a "non-slump" (protip: it still slumps) self mixed variety. Create a level line all the way around with a good quality level and/or laser and use that to start your first row or two. Use either bullnose tile or aluminium trim edging to finish off the sides. Edges should never be grout, grout goes between tiles only (and maybe between tile and trim if you oversized your trim accidentally). Also, for changes of plane use bathroom rated silicone - make sure to pump enough to bind to either edge of what you're filling, then use a popsicle stick and soapy water in a spray bottle to contour it (would advise practicing on a throwaway makeshift corner first).

I could expand significantly further on each point but it gives you basic building blocks to work off of, and I don't feel like writing my usual novels right at this point in time :)

1
crunkadocious•

I have Hardie backer for the shower walls.

I'm mostly concerned with how to make the floor look good with such a weird shaped tile. Like how do I cut it to make it look good

1
CursedSun•

It depends what you're cutting around, how tight you need to be, whether or not you're covering over your cuts.

For instance, around the edges of the room with standard porcelain I'll allow ~5mm off my cuts knowing that skirtings and/or wall tiles are going over top (~8-12mm thick typically, ~3mm bed of adhesive), so I don't want/need to have it appearing perfectly tight and neat (there's also the whole expansion/contraction thing).

If I'm cutting around a toilet base, then as long as the toilet is given sufficient support I'm not fussy in terms of how much of the floor under the toilet I cover.

If I'm cutting around a curved acrylic shower tray, I'll probably paper pattern scribe around it so I can get it fairly tight so the silicone bead doesn't end up looking horrific or anything.

As far as tools to cut with. Wetsaw, snap cutter, angle grinder, tile saw, hell, you could even go oldschool and using a tile coping saw (please don't do this). There's even more methods available though they work on the same principle. It just depends what ones you're willing to buy and how efficient and useful they'll turn out to be. I do all my cuts dry, straight lines running through the tile on a snap cutter, anything that can't be done on the snap cutter gets cut using an angle grinder (115mm with diamond cutting blade, the blade itself used depends on the tile I'm cutting and the finesse required). Americans that "do a bit of tile" typically have a fetish for doing literally everything on a wetsaw (waste of time if you do much tile at all imo). Most of the good pros just use anything and everything that works efficiently for them up to their standards, within reason.

1
andruszko•

I'm surprised anyone can even try to blame the tile. I installed the same stuff in my house, learned to do tile (just finished grouting yesterday!), and even I know ALL 36x6 wood look tile has a bow to it.

It doesn't matter where you get it from, it's because of how the tile is made. Getting it from HD or somewhere else doesn't matter either.

There are two major issues with your tile job that even I, a beginner with no tiling experience, did correctly. Firstly, it's not a 1/3 offset. That's going to make it worse. Secondly, he didn't use any type of tile leveling system. I used the raimondi system myself. Sure, I had a couple of issues where clips broke. But it sucks the middle of the tile down, pulls up on the edges, and 99% of my floor is lippage free. And that's using home Depot SECONDS, I paid about 60c a square foot for it and had 5% waste including tiles that I threw out.

The shower isn't waterproofed. I wouldn't pay another dime and would insist they correct it. This tile guy has no business doing tile work.

13
sunshine2134•

How can you tell the shower isn’t waterproofed? I know nothing about tiling so just curious.

1
frenchiebuilder•

3rd picture, where there's tiles left off? The higher one, you can see the lettering on the cement board. Whereas if it was waterpoofed, you'd be seeing that.

5
mwax321•

Yeah I just bought the wedges to keep all the edges flat when I tilted. The second time tiling I did it with just regular spacers, but I spent an ungodly amount of time making sure that the surface was flush.

It's not even that difficult for an amateur to do better than this by using simple tools you can get at home depot...

1
blacklassie•

Not a penny more to this guy until he fixes that floor. That’s BS.

12
apjayoOP•

whats the fix? Rip everything up and start over?

10
jitler•

I would have the old dude take it out and have someone new put it in who knows how to properly do it, on his dime....

10
blacklassie•

It’s not really your obligation to find a fix for their poor workmanship. The tile should be flat. It’s their responsibility to figure it out and fix it.

4
apjayoOP•

Just want to have a couple facts lined up. He is blaming the tile so trying to build up a couple facts to counter.

6
blacklassie•

Ok... That tile will have a little texture, but there shouldn’t be unequal edges like that. It’s a manufactured product designed to lay flat. Blaming the tile is BS. If the tile was defective, he couldn’t see that, or bother to give you a head’s up?

6
John_SpaGotti•

"OK, the tile is bad. How did you set a whole floor full of bad tile and didn't notice it was bad? OR why did you continue to set bad tile without informing me it was bad? Either you don't know what you're doing, intentionally do shoddy work, or failed to communicate to me an easily remedied problem. Either way, you're going to get me back to a ready-for-tile surface and we'll go from there."

Then, don't pay him anything else and call someone new.

1
TimeSlipperWHOOPS•

"It's bad tile, mate."

-1
KingBaby87•

The lippage on that floor is really bad. I'd definitely complain and make them fix it.

12
Duck_Giblets•

One word. Waterproofing.

Sorry op.

9
MiltonJBederson•

All large format tiles are inherently bowed a bit. It comes from the baking process and is impossible to 100% avoid. I purchased and installed a 36” wood plank-look porcelain tile. It was not cheap and I was able to get it directly from the manufacturer. Like someone mentioned before, any installed should know that you have to use a lash or some other tile leveling system when installing these. 1/3 offset also helps. Mine were significantly bowed but were made level with the lash system.

This is NOT a tile problem, it’s a contractor that is inexperienced installing this flooring.

6
okjetpilot•

i would document as much of this as possible. there is no way that shower is waterproof. you can't see any membrane where the valve hasn't been tiled. Also they seem to have thrown spacers in the wall like a toddler eating breakfast. this is almost as if they tried to do it wrong. spending 30 minutes on youtube and this old house videos could have prevented this.

3
apjayoOP•

It said to pick up another box and he will replace some tiles.

​

There is no membrane just concrete baker. He said that's all you need but not sure how much to press him on it.

2
RahchachaNYAdvisor of the Year 2018•

He said that's all you need

He is clueless to tiling and tell him to stick to making sawdust.

7
sunshine2134•

So our tiler said a did the same thing. Said cement board is enough to waterproof. Not the case?

2
RahchachaNYAdvisor of the Year 2018•

Not at all. It will wick and hold water. It won't degrade if it's soaked but it definitely won't prevent water from penetrating through it.

One exception: Densshield. It has a waterproof coating but the joints need to be treated properly for it to actually be waterproof. https://www.buildgp.com/product/densshield-tile-backer/

4
okjetpilot•

fucking press the shit out of him until grease comes out of his nose pores. Even if he has concrete backer there should still be redguard or something and from the pics and your story it doesn't sound like there is.

1
greatwhiteslark•

I'm a DIY'er and this work is utter garbage, from the uneven tile to improperly waterproofed shower. I'd raise hell, get a refund, and make them tear out that work.

3
evolve10r•

Yeah bad craftsmanship there on the floor and as far as symmetry in the bath it's probably the way he centered the tile on each wall that throws it off the left and right side of each wall should have the same size cut pieces

2
GatonM•

never never never have this format of tile installed by someone without a GREAT reputation. Its some of the hardest tile to install. And they are known to bow, but that would be some of the worst id ever seen. The offset has already been mentioned at thats important, some people dont like the look after they realize how it needs to be offset. Even with a perfect offset though it still wouldnt look like this, this is a bad install, its possible the tiles are bowed to make the issue worse but this is bad.

2
denisebuttrey•

I'd be an upset homeowner. Good luck with your pursuit.

2
hnb7•

Oh hun... I don’t have any advice, just yikes

2
Petzl89•

Shower isn’t waterproofed at all, needs to be torn out. Wouldn’t move ahead another inch until it’s pulled out, replaced, waterproofed and inspected by you before tiles are put down.

1
TheRealCliffClaven•

I would not continue or at the minimum ask them to correct the issue.

  1. the sub is not using a level to ensure the tile is level

  2. there should be no mortar visible between the tiles in the shower. The grout goes there when done and if you see mortar now you will see it after which will make it look horrible

Sloppy work.

0
Duck_Giblets•

Uh. I'm a career setter.

You just clean the mortar the next day.

Actually speaking from experience, u/cursedsun works cleaner than I do. But thinset takes a while to cure.

Hell of a lot more going on in these photos but mess is a non aspect.

Also cursedsun, I was given 10x bags uls2 free, semi expired but mostly usable. Want 5?

5
CursedSun•

Pretty much this. Rake out grout lines the day after with a knife [set so you can go deep enough into the grout lines, but not so deep as to pierce any waterproofing product(s) you may be using], unless you're using quickset it'll still be relatively green and easy to do so. Ideally use a grout line toothbrush and a sponge and make sure to clean as you go, but that's mostly important for quickset because under good conditions it'll be hard as a fucking rock. I recently cleaned out quickset from day-after (tl;dr working with not my tools that day...), it took me nearly half an hour to tidy up a floor that had 24"x24" tile on it. Never going to make that mistake again.

You get basically perfect coverage, so there's that trade off :P

Am actually keen for that, have something lined up in the next month or two where it'd come in very useful.. :) Also, have you tried uls2 rapid yet? It's nearly as good a quickset as ardex quickbond (talking in the cold where keraquick and granirapid don't really live up to being "quickset"..), depending on whether or not you take issue with it deforming more than quickbond does.

1
Duck_Giblets•

Just need to sort out shipping, still 75kg, and not yet.

Apparently mapei are launching a new ultralight formation on Wednesday so there's that..

1
CursedSun•

We got a test bag of ULS2 Rapid to try out. Might well be that. Old mate at the tile shop seems to like having us in particular field trialing new stuff - probably because we're brutally honest haha. It's good, definitely the new preference out of Mapei's quicksets for me (still prefer ardex's quickbond over it though personally), don't know the price point yet though.

Flick me a pm on the shipping side :)

1
TheRealCliffClaven•

The sloppy comment was in general speaking, and I will give you the point of cleaning mortar afterwards. However, looking at the floor job I would error on the side of caution and again say sloppy work. Oh, billy the way I have experience as well or I would not have stated it.

-1
[deleted]•

[deleted]

2
DangerHawk•

Just an fyi and def NOT apologizing for the contractors shitty job. Grout lines get cleaned out before grout is installed. It's nearly impossible to keep mortar from squishing in even if it is applied right.

The tile doesnt neccesarily have to be level, just in plane with no lippage. It looks like the tile OP provided/chose was deeply bowed, which happens fairly often with this type of tile. The contractor should have alerted OP however and stopped work after setting tile #1.

3
emilioml_•

The key for leveling the tile is to walk bare foot do you can sense any inconsistencies

0
RahchachaNYAdvisor of the Year 2018•

What do you have,callibrated feet?

2
emilioml_•

At least that what they do here in town. Old tiling masters

1
RahchachaNYAdvisor of the Year 2018•

I would trust a 10' straight edge before a old guy in his bare feet.

3
emilioml_•

10 cm edge? why that , better use a meter.

1