Possible breach of contract, or wishful thinking?
Good afternoon all,
I live in South Dakota. I am currently in limbo with a residing project for my house, and could use advice from people who may know better on this subject.
I live in a single story house with an attached garage. On the north and south sides of my house the roof is flush to the wall itself, so no gables, soffit, eves or anything of the like. This is very apparent just by looking at either wall, it is not hidden.
We had our contractor come out and do an initial estimate on what the cost would be to have the house sided. Based on that initial estimate we decided to move forward. Our contractor them came out a second time to do an exact measure of our house, this was to make sure the right amount of siding and supplies were ordered.
The pricing agreed upon was set after the second estimate was done. Which I took to mean that they took into account the fact that the north and south walls were flush to the roof.
Everything was ordered and has arrived. We had the folk who were going to install our siding, a subcontractor under the initial contractor, come out and do a walk around the house and they immediately noticed the flush walls. With the way our siding would work it would leave a gap along the top of each wall and would allow water/debris/what have you go right behind the new siding.
Estimated cost to essentially extend my house both directions would be somewhere in the rangebof 3-4k per side. This would increase the total cost of this project by 50%.
At this point would I be on the hook for the additional work? If this was a failure within my walls, or rotten wood, I would just accept it as part of being in an older house and move on. But this was blatantly apparent from the get go.
Would my contractor be on the hook for the work, as they missed this during both measurements? Because of such a big increase in price could I argue that the contract was written under false pretenses?
Or am I seriously deluded?