MBTA’s analysis predicted that the increased emissions of running diesel trains every 15 to 30 minutes would produce so much additional pollution that the three diesel-powered “Rail Vision” alternatives predicted a net increase in greenhouse gas emissions and smog-forming nitrogen oxides, in spite of taking thousands of cars off regional roadways.

Yeah, so we really should switch to electric trains

the “full transformation” option, which electrifies the entire system, would cost $28.9 billion

Better start saving our pennies for Big Dig 2: electric boogaloo

46
snoogins355•

Rather spend it on public infrastructure rather than aircraft carriers and bombers

30
f0rtytw0Somerville •

Perhaps if we weaponized electric trains...

14
snoogins355•

Freedom rail! Like the national defense highway but for rail!

13
TheSausageFattener•

Did somebody say railgun?

6
f0rtytw0Somerville •

using high powered magnets, cities such as Worcester, Lowell, and Providence fire trains at super sonic speeds at Boston.

4
[deleted]•

[deleted]

1
[deleted]•

[deleted]

35
volkl47•

Operational constraints is one likely reason.

All Middleborough, Greenbush, and Kingston/Plymouth trains have to squeeze through a single-track section near Savin Hill. And fixing that will probably take billions/major I-93 disruption.

10
OutsiderAvatar•

Single track sections south of JFK would not be an issue if they put the Red Line underground all the way to Braintree.

2
volkl47•

Which would be an extraordinarily expensive project for minimal gain that no one is realistically considering doing anytime in the next 20 years.

Especially considering how difficult the waterproofing would be, it would have to be built like a river tunnel with the proximity to the water.

3
OutsiderAvatar•

Not advocating they actually do it, but it would solve the problem.

1
Diamond_Blue_S500Brookline 🚙⛽️•

I question this math. The MBTA has previously said that the North-South rail connector alone would cost $21.5 billion.

5
sinistimus•

Here's the price table from the NSRL report. The most expensive price was $18billion for a 4 track 3 station tunnel (the $21.5billion number was including some other infrastructure investments that were deemed necessary to run enough service in the tunnel that would make it worthwhile, these investments are obviously also done under the "full transformation" scenario). Rail Vision appears to be assuming a 2-track 2 station tunnel, which would cost as little as $8.5billion. Also these numbers have been in 2028$ while the $29 billion rail vision has given for the "full transformation" is in 2020$, so it might be worth looking at the 2018$ figures on that chart for more comparable numbers.

6
[deleted]•

[deleted]

2
sinistimus•

Also, why wouldn't Randolph and Brockton get the Urban Rail feature?

Even if we eliminated the single track constraints on the Old Colony branches, it still wouldn't be particularly good idea. Urban Rail along this line would presumably consist of:

  • South Station
  • JFK
  • Quincy Center
  • Braintree
  • Randolph
  • Montello
  • Brockton
  • Campello

And then the conventional service on the line would likely consist of:

  • South Station
  • (?) occasional stops at JFK, Quincy, and Braintree
  • (?) one of the Brockton stops to allow transfers to urban rail
  • Bridgewater
  • Middleborough/Lakeview

The second service seems hard to justify, and it seems like if the ability exists to run more trains to Brockton, it would make more sense to just run all those to Middleborough. Also note that all the stations on this M/L Line (except Randolph) that are the in same distance from downtown as the proposed urban stations are already served by the Red Line.

I could see it maybe making sense if we are doubling down on running South Coast Rail through Middleborough.

tldr: Doesn't make sense to run a service that reaches all but the last two stops on a line.

1
nofatsplz•

I can feel my property value getting erect

17
maci01OP•

That's what I'm sayin'.

7
MiscellaneousBeefDowntown•

If they actually do this, that would be fantastic. I'm gonna go to their meeting tomorrow.

15
powsandwichOrange Line•

Even Alternatives 3 and 5 would be nice. Just seems like anything that doesn't include electric is gonna paint us into a corner in the not-so-long run. I don't think it would be feasible to try and match increasing demand with more diesel service. But yeah if we're going to mobilize any type of transformation this thorough we might as well go big

https://cdn.mbta.com/sites/default/files/projects/commuter-rail-vision/alternatives/alternatives-v4-revised-2019-05-06/railvision-alternative5-v4-renumbered.pdf

13
[deleted]•

[deleted]

6
volkl47•

There's nothing that says it can't be used for that, but the map and article is about MBTA operations, not what Amtrak would be doing.

12
[deleted]•

[deleted]

-1
Maxpowr9Metrowest•

Especially if they can get a large chunk of Federal funding for it.

4
ProfessorJAM•

I wonder about the expense of going electric, Electricity is super expensive in the Northeast at least in comparison to the Midwest (I moved here from Michigan).

4
MisterItcher•

Cheaper than diesel!

15
lolpie24•

More electric sources are coming, by the time any of this could be built, Hydro Quebec will have completed its power line to Mass and some form of offshore wind could happen!

9
christmaszeevFenway/Kenmore•

No doubt (at least for now) the per-unit-energy price of electricity is somewhat higher than diesel, but when you look at long run train reliability, energy efficiency, and the fact that diesel will someday be more expensive than it is today, it seems worth it to me to just make the investment now.

​

Edit to add: Also, EMU trains accelerate/decelerate faster than DMU trains, which accelerate faster than locomotive-hauled trains, which means more frequent service is possible with fewer trains with EMUs.

1
Victor_Korchnoi•

Does anyone know what is meant by "Grand Junction (shuttle)" on the map shown in the article?

2
merrythicc•

I'm not entirely sure about the use of "shuttle" but it's probably just to indicate that Grand Junction railroad connection between North/South stations.

2
Victor_Korchnoi•

I went to the public meeting tonight. The Grand Junction Shuttle refers to a 15 minute headway electric shuttle running between the proposed West Station and exisiting North Station with 1 stop near Kendall. They would make a second track so it could run in both directions.

3
[deleted]•

[deleted]

2
OutsiderAvatar•

Calling BS on the picture. All the Fairmount line trains I've ever seen are single-level coaches only.

1