New solar install, installer not using south facing roof.

So I just got solar installed yesterday. They started on the west side. I didn't think much of it as it was on the plans as well.

Went and looked at it when they completed and they installed the panels that should of been on the Southside on the westside. South side is completely uninstructed but is a smaller area.

I contacted the installing company and they said was done for esthetic reasons.

How pissed should I be?

Posted Oct 29, 2019, 3:37 PM UTC

4882
traveler19395•

You shouldn't be pissed until they resist making it right, then be really pissed.

You mention plans, what did the plans show for the south facing roof? Did you see and understand the plans before installation day?

40
zortechOP•

I did. And yes. It showed an array on the west and south. The plans they left for the inspector show west and south array.

28
traveler19395•

They didn't follow the plans, it's all on them. Start polite, escalate as needed. If you post your state you can easily get suggestions for the relevant agency to file a complaint with.

49
zortechOP•

I am located in Florida.

17
thatdude858•

Look you're going to have damages. That system will materially produce less kWh over an annual basis than the original one you modeled and signed on for.

Did you finance this through sunpower or sunrun? Did you pay for it in cash? You need to let them know/ the installer know that you will be pursuing this through the legal system/small claims.

28
Beerbonkos•

You may live in an area that does not permit panels on the front of the home. You can check with the inspectors about building codes.

6
bort4all•

That should have been figured out before the plans were made and approved.

12
Beerbonkos•

Absolutely it should have but installers have been known to make mistakes.

2
dragonf1r3•

Florida law prohibits those kind of restrictions. Still should be reflected in the plans either way.

4
Beerbonkos•

I am not aware of Florida laws but up in the north east many towns and villages have their own regs.

3
rejexulous•

They lied to his face regarding the reasoning. He can be pissed right now with cause.

17
traveler19395•

Sometimes there's a bad employee; give a company a chance to quickly fire/discipline that employee and quickly make the situation right. As soon as that doesn't happen, be pissed, raise hell, get a lawyer if necessary.

11
rejexulous•

It wasnt one employee. It was a crew of 4, or at least the crew boss that made that call. OP states that he didnt confront the install crew, but the company rep (presumably at HQ) who told him they did it for aesthetics (a lie). So that's at least two, likely 5, customer-facing employees who messed up. Sad thing is, why would OP even feel the need to ask first on this forum before justifying his concern? Hell yeah, be angry, and politely demand exactly what you paid a lot of money for.

9
rejexulous•

Pretty pissed. They did it because installing separate arrays is more work from a racking and wiring standpoint.

39
nickolove11xk•

I had shit like this happen with my HVAC. First the sales guy said we needed to enlarge a return grill. Then the installer shows up and says we didn’t need to. We were moving it so we paid 500 to move and enlarge. Since they didn’t enlarge it they just used the old box. I would have moved if.

6
Green_Meathead•

Incredibly pissed.

They breached contract for the purpose of using less hardware and labor.

Tell them they need to come back and move the panels to where you had originally agreed, and then seal the holes on your weat facing roof. Anything other than a speedy yes should be met with an attorney. Threaten them if you have too.

What a bunch of scumbags

12
JustWhatAmI•

Was the panel location not specified in your quote?

That's frustrating because I feel like the home owner should have final say on whether you want aesthetics or efficiency

10
zortechOP•

It was. Have drawings saying south and west.

12
pinche-pinche•

If it were me and I had signed off on a south and west design I would be VERY pissed. I would contact your sales rep right away and ask how they’re going to make this right.

24
TheSasquatch9053•

If the quote was for two arrays, one on the west and one on the south roof surfaces, There should have been a change order documenting that you approved a change to one west facing array. If there wasn't you should be able to make them come back and install the panels correctly.

19
combatwombat007•

And re-roof the side of the house they take panels off of because empty racking is ugly and pulling the racking is going to damage the roof.

16
TheSasquatch9053•

depending on the cost of re-roofing, maybe just get them to give you more panels.

25
kieranmullen•

Or leave the racking at no cost possible future expansion

2
rosier9•

You should be upset. You signed off on a specific design, they don't get to override that because they thought their new design is more "aesthetic".

Run some pvwatts.nrel.gov numbers to see what the difference in production is to quantify the damages. They need to make this right. I would ask for additional panels to makeup the difference, not removal and relocation.

Side note: if you're on a time of use electric plan, they might have done you a favor.

15
omglolthc•

They would have needed to submit official plans to get permits for the installation including agreements with the electric company.

I'm guessing this is a lease agreement?

3
zortechOP•

Nope. Financed by a loan, but owned. I have a copy of the paperwork for the permit.

5
mtmsolarsolar engineer•

Lots of AHJ's will let you do changes and then submit and final 'as built' planset. It isn't uncommon to change designs based off of actual roof dimensions/conditions but they should have asked you first.

Call and ask what the reason was, maybe the panels don't fit in the configuration that they sold you, or there is a roof change that they were un-aware of. Or maybe it was just lazy installers.

​

You should without a doubt call the company and ask for an explanation though.

2
JustWhatAmI•

What they did was not cool

2
cocuke•

Push them to correct the problem. If they don't you should be pissed enough to take legal action. Solar is to be efficient, not necessarily aesthetic. I see a number of solar subdivisions going in where I live and some of the homes have the panels on the north side of the roof so they aren't seen from the street. I don't know what people are thinking.

9
robot65536•

Wouldn't it be great if they made it right by installing the south array and leaving the west array extra large? Might end up costing them the same since they wouldn't have to repair the roof under the west side.

7
zortechOP•

Would be nice but the million dollars of insurance liability might hurt. I went for the max I can generate with that insurance.

4
brycenesbitt•

???

5
zortechOP•

Florida has multiple tiers of power generation. Between 0-10kw has no liability requirements. 10+kw requires a proof of 1 million dollars of liability insurance.

I have a 10kw system. Any increase and I cross into that tier 2 system.

5
bjorn1978_2•

Have them install extra panels on a 10 kw inverter. The extra panels will ensure that you will have 10 kw even on a shitty day.

5
OmgNoodles•

Yup. I’m in Florida with a 15.84kW system and have to pay $220 a year for the million dollar liability insurance.

4
propanetable•

Remove and replace with a warranty on the roof surfaces affected OR add more and cover 10 years of insurance OR PVWatts to calculate decrease production that they can pay for 25 years worth. There are lots remedies possible.

3
EnergyShroud•

That is incorrect. You can have an 11.7kW system and still be in tier 1.

yeah yeah the power company says 10kW, but that is AC. 11.7kW DC is the same size so you can add up to 11.7kW and be in Tier 1.

1
raptorbluez•

West facing solar panels produce about 20% less power. Your 15 west facing panels will only be producing the electricity of 12 south facing panels.

You should react in exactly the same way you would if they shorted you 3 panels for "aesthetic reasons."

7
brycenesbitt•

Depending on Time of Use rates, the 20% less power from the west panels may be worth more $$$. We need to know from IP what exact angle each face of the roof is.

0
brycenesbitt•

You should go to Project Sunroof or Energysage and get a roof diagram, showing the potential of the house. Post it here. We can help tell you how big a deal this is.

Asthetic reasons are the choice of the homeowner, not the installer.

6

no you should not go to energysage. Energysage is the reason the the industry is going to shit

4
dcsolarguy•

EnergySage fucking sucks

4
brycenesbitt•

More specifics?

1
blade_torlock•

You have a permit, don't let the city/county sign off on it until they have it match the plans that are on file. No sign off no money.

5
RyCamN7•

Unless you specifically requested them on that side for aesthetics they shouldn’t just take it upon themselves. We’ve had plenty of customers not want them on the front but we would never just do that ourselves.

4
pythonex•

OP, stop checking your Reddit inbox and go call the company and ask them to come remove 15 panels and install them on the south side. Period.

Then call the inspector or the utility company and complain about the inspector who gave them the ok (if this inspection actually passed), assuming he saw the panels should be on South and west sides.

If nothing works, take legal action. Do your homework and prove that you lost x% of the production and ask for Y amount of money. Or to fix it. If you take this course, don't forget to trash the installer on every social media outlet you use. This is the consumers' weapon of this era.

3

Don't say anything on social media. Decide on what price is worth an NDA. Fuck it, make some money. They don't go for it, blast on social media.

3
zortechOP•

I have already let them know I am not happy. I will give them a day or so.

The inspection hasn't happened yet. I will talk to to the inspector/block approval. When that comes up in the next few days.

2
pythonex•

That's good. Let the inspector know you're not happy and worst case , let them provide a 3rd party solar analysis of the new estimated solar production

1
Platinumboba•

Have them come back and reinstall properly. That's going to impact your production quite a bit depending on your region

3
NECESolarGuy•

If you signed an agreement with a layout and they are building something different than what is in that agreement, then they are in violation of the contract. You have all the leverage here.

Our agreements include a statement of work with the layout... that is legally binding to both parties.

3

I would ask for a significant discount.

2
SFW222•

Curious- did they have you sign off on it when it was completed?

2
itsme113•

they messed up big time, If it was me i will be really mad. Check the PVWatts web site to see how much you will loose

on production every year for those 15 panels. Ask them for a refund for this lost production in say 30 years.

2

VERY PISSED.

Reason number 956 to go to Angies List, call a reputable installer who will come out with a ladder and a suneye to take measurements onsite and then present you with a options and educate you as to all your options.

1
[deleted]•

[deleted]

1
GregErikhman•

They did it to put more (less efficient) panels and make more money as most systems are built to consumption needs

1
[deleted]•