r/SolarDIY•
Funless

Questions on solar farm in Arizona or California.

I'm thinking about doing a small-scale solar farm and I'm wondering how much the power companies will pay me. I think it's around three or four cents in California, but I'm not sure about Arizona. Also, are there extra fees or anything that a solar farm would have to pay? Thanks for the help!

Posted Jan 9, 2020, 8:56 PM UTC

514
from_dust•

Insufficient data to form a meaningful response.

There are a myrad of factors that would bear on this with dependencies and subdependencies of their own which are not identified. scope and scale and more defined location is a good place to start

2
FunlessOP•

What factors are involved that determine how much the utility company is going to pay me per kwh on a solar farm?

"scope and scale and more defined location is a good place to start "

I thought the amount the utility pays is regulated by the puc?

1
FunlessOP•

Im Thinking 1MW size

1
FunlessOP•

I don't have a location yet. Do some locations in california pay more than others, or some locations in arizona?

1
Marck_Feet•

If interested, I can help you with a economic study to see the profit-earning capacity of the project.

I’ve done a couple of this studies before. Also I’ ve participated in a 20 MW solar project in California.

If you want we can keep this conversation through a private channel.

Regards.

1
fuzzyoatmealboy•

Can I take you up on this too?

1
Marck_Feet•

Of course!

1
FunlessOP•

I'm not really looking for an economic study. I just want to know how much utilities will pay, say per kilowatt-hour.

0
Marck_Feet•

Well... utility is the difference between gains and costs. To know this gains and costs there is a hole economic study in which you have to get considerations as installed potency, place, irradiance, taxes... etc. Then you’ll know your utilities, based on that you have to compare them to your inicial investment and check if it’s profitable rather than other inversions.

Business requiere study.

If you’re not looking for anything like that, then you can inquire on Google and it’s gonna be faster.

Regards.

2
from_dust•

For power generation at that scale, this seems like a nonstarter in CA. it may work in AZ assuming you have a location with cheap enough land, good enough sun but not enough wind.

a 1MW farm will take about 4-7 acres of land. In CA, a 4-7 acre location like that is going to be astronomically expensive for the use of solar generation. A single modern wind turbine produces over 2.5x that power and takes up ~100 Sq.Ft., the economics dont really make sense in any location with a local utility you can link up to.

1
Moolokoo•

I recently started working for a commercial solar company that manages hundreds of solar installations ranging from a few KW to over 20 MW and we could totally help answer some of your questions. Feel free to PM if you want more details.

1
fuzzyoatmealboy•

Can I take you up on this?

1
Moolokoo•

PM sent. Sorry don’t want to seem like a shill or whatever it’s called.

1
JesusInTheButt•

Absolutely nothing during the middle of the day. The grid dumps solar right into the ground at noon, it's not worth transmitting it. At 5-9? Sure, but you're not going to really be producing much then. Look up Time Of Use optimization