Every god damned day

Posted May 22, 2020, 7:55 PM UTC

Posted May 22, 2020, 7:55 PM UTC
Electrical contractor to coordinate all requirements with manufacturer and owner. Provide all connections, j-boxes and accessories as required for a complete installation.
On the other side of this equation is the poor architect who’s asked like 80 fucking times for all the cutsheets and pertinent data. The client or their vendors either can’t make up their fucking mind, provide USELESS information, and keep changing their fucking mind up until the drawings are issued.
Then on top of that the fucking GC is like “where’s the prints? But but muh schedule” which mind you that schedule has been put together by some still wet behind the ears kid fresh out of college who has never swung a fucking hammer in his life but drives a giant pickup truck all while the firms principle architect swings by your desk saying “hey I promised the GC drawings today get ‘em wrapped up.”
That’s why you end up with vague ass notes. Because if I put nothing you guys are gonna bend my ass over the barrel because “I forgot something.”
Lol wow, sums up the cluster fuck of consulting in a nutshell 😂
Believe me, if we had the information ahead of time we'd design the shit out of buildings.. But it's simply not there at time of design.
Then you're asked to produce drawings so that the schedule isn't delayed...
Design engineer here and totally agree. Been in the consulting field for 5 years. It's all about time. Owner wants a project designed in 5 weeks that really should take 10. Management agrees to the job and tells us to find a way to get it done. This is in addition to the 4 other projects I'm designing. As my old manager would say, "9 women can't make a baby in a month.".
We end up producing shitty drawings and I get chewed out by my mgmt, the architect, all while the contractor thinks we are idiots.
On the few occasions we have enough time to design, it feels so good and I actually enjoy my job. This is not common and yes I'm thinking about getting out.
"9 women can't make a baby in a month.".
I'm stealing this.
Yeah this shit drives me nuts.
I don't know if it's any different out of a big city but out here, it is just standard. Its 100% guaranteed.
No different imo.
And verify in field. Fuck VIF!
No shit. If I have to field-verify it, I might as well get paid to design it.
I like when the spec says owner supplied equipment. How the hell do I know whst they sre going to buy.
Doing commercial kitchens i now always stub s 3/4" up to the ceiling. I never connect boxes in the wall. Print shows a 15a receptacle for s rice cooker.
Head chef goes and buys s 3 phase 40amp ricecooker instead
I ran a circuit for a 3 phase margarita machine. Weird as shit
Dude, now I really want a 3 phase margarita machine
All the money they spent on having you install and provide 3 phases, won't ever be recouped by how efficient that bad boy is. Some people should have their engineering degree's and licenses revoked.
That sounds awesome
We are required to install per contract drawing. Changes need to be approved on a revision, additional loads calculated, and change order submitted. My PM would loose his shit if I just started wiring whatever the customer wanted.
I know. I dont even think about a change order untill we get a PO. It just sucks when the additional load means my pipe is too small. And the wall is floor to ceiling tile.
By stubbing every receptacle to ceiling space it give us an easier time to accomade the changeorder.
Kitchens are a fucking nightmare. You can coordinate things to shit... But somehow, it gets lost in translation somewhere along the line.
Neither do we!
I love how equipment shows up. We point out" uh. We have a problem here" they bring up some bullshit line that says " verify requirements before rough-in"
Maybe we should rough-everything in with 2"
The sparkies Habitat hired for my build are going to have to deal with that. I bought a pull box of Cat6, a bunch of low voltage new work boxes and keystone plates because we had an agreement with Habitat that, as soon as the electrical rough in was approved, I'd be allowed to take a day pulling network cable with my boys. (I'm a retired network admin, so I do know how to do network cabling)
Well, now with the COVID-19 restrictions, Habitat has decided to just hire everything done. I am not allowed on site anymore. Habitat is going to be asking if the sparkies can pull my wire when they go in to do the finish work. (with me having to pay for the extra work <sigh>
But, because finish usually comes after drywall, I suspect my new work boxes are going to be useless. I already know it will cost a lot more to pull cable after drywall goes up than before. And I strongly suspect I won't get all the drops I had planned since nobody has contacted me to find out what I had intended. Hell, nobodies even asked me where I ended to set up my switch gear.
All drops should have been on the prints you submitted and approved.
There are no prints of the network. Back when I first told them I wanted to add cabling, I offered to add them to the copy of the floorplans we were given. I was told that, because I was doing the work post-rough ins, that it wasn't needed and would be a distraction to the trades.
Now that everything is being done by pros, I had expected to be contacted asking what I wanted, but I haven't heard from anyone. Just sent an email to the local chapter director this afternoon asking about that.
That's the tricky bit, even the owner has no clue what they'll buy.
eh. plumbing designer... its a nice little CYA note for us.
architects have a habit of changing specs AFTER we have made permit drawings or their specs are TBD.
So we have to take a best guess at a solution.
trust me i much rather be exact but when i do that i end up with a contractor submitting basis of design and installing a different pump... which cant handle the basis of design tempature loads...
an architect who forgets to furrout the wall that was coordinated 2-3 times. (no you cannot run a 2” elbow in a 2-1/2 inch stud wall.
or a last minute change of hey we want to do a hot and cool water dispenser but we told you a hot water dispenser instead....
so for us it keeps us from being liable since the architect didnt survey. the existing conditions might change from construction while we make permit plans, etc.
[deleted]
Out of curiosity, what has led you to this conclusion?
[deleted]
That makes perfect sense. Of course, the downside of forcing them to try and enforce it means that you will lose them as a customer. We try to be accommodating, but I've seen a lot of GC's try and abuse that about us.
If its different from the prints, its a change order.
If we need to order soe.thing to make it work and it is not on the prints, its a change order.
But the spec says....! The prints say this, the approved shops say this, you want anything different, its a change order.
See, our shop isn't like that. We are happy to work with our GC's to move the job along. Particularly when it doesn't involve extra work. It is no different 90% of the time if I move the conduit a few feet. Sometimes it even saves us money on time and materials.
It is moving stuff that is already in place that gets to be a pain in the ass.
Of course, we have a good working relationship with a hand full of GC's, and they do the same for us.
the phalanx of lawyers at the company i work for disagrees.
... but i'm not entirely sure which post you're replying to. i'm assuming you're generally replying to the requirement that everything gets field verified / corrected if the prints are off.
EC's are expected to comply first with code, second with manufacturer's installation instructions, and third to the submittal drawings. which includes knowing when the drawings are wrong, and what needs to be done to get the install completed correctly.
if they come to me with a problem, and it's the drawings i provided, i'll happily cut them a CO and laugh all the way back to the office, where i can throw the submittal team right under the bus.
if they install things wrong, but "by the drawings", they're obligated to fix it, or are susceptible to back charges to have the problem fixed for them, and liquidated damages if doing so delays the project and i get hit with a bill from the GC.
but to reiterate, since the last thread i posted this on, hurt some feelings... the very first option for the EC is to reach out to me and point out where our drawings were trash. then it's mo-money for them to fix it.
[deleted]
Right, we'll deign a great system, contractor will "value engineer", convince the client that our design is too expensive, have the client take the gc side. Client is adamant we go the cheaper route. Change is made. Gc keeps the difference, completes the project. Now a year after construction, problems arise. Gc and client blames the engineering firm.
Shitty cycle.
You’re making me regret more studying for EE
If you sign a contract to do it, it's enforcible. If you don't think you can figure it out, don't bid on those jobs.
Means and methods. If I design off Eaton and you go buy Square D and it requires different points of entries, you're gonna hit us up for a change. Even when we model everything to the T, contractors do it differently. There's no point - it's a waste of time.
To be fair, we don't get the information we need to get the work done.. And if we do get something that's preliminary, it may very well change once it's ordered.
As someone who reads some of these blueprints to provide materials, let me tell you the number of times this type of diagram has been drawn with a pencil, faxed five times, copied another three and then emailed is too damned high!
And then the description would be something like "Lego or equal, 5.3mm, metal"
OK, 5.3mm long I guess, how wide? How tall? And they don't make them from metal, can you use plastic? PVC or PET? And what color, because there are 5 colors. And by the way, the project is imperial measurements and you're calling out metric....
Had a project call for all wiring devices to be of "Smith and Stone make, or equivalent" which might be one of the worst cases of copy and paste specs I've ever seen since that brand closed its factory doors in 1992, and were more known for bakelite products back in their heyday regardless....
Sounds like military specs. "All replacement parts must be new OEM. Reconditioned parts not acceptable." Well, this switchgear is from the 1940s so lemme just call around and see who has brand new WWII hardware sitting on the shelf.
Sounds like you just got contracted to replace the entire installation since the smallest replaceable component that meets spec is the building.
I just got an “as equal” request denied and was told to provide one of the named manufacturers for building wire. Well, #1 only makes high-voltage cable, #2 only makes wire rope, #3 only makes MC/AC cable, and #4 went out of business and was bought by the one I submitted, so wanna take another look?
I get prints that call for cadmium plated bolts, a plating that was outlawed a couple decades back.
i think i know whose engineer's are just copy-pasta their sets.
i like when i get BOM's that list stuff nowhere in the drawings, and then get a big shoulder shrug from engineering, "oh i just copied an old set". well, i sure hope your wiring sizing is f*cking correct, you lazy ass.
Yea. That's not right, negligence imo.
There's nothing like getting a PDF made from a phone photo of a print, especially when the person sending it has the original PDF that they sent to the printer in the first place.
Bonus style-points for taking the photo in a way or at an angle that distorts the print as much as possible and preferably creates a pdf with a weird quadrilateral look.
And don't forget the people who can't seem to help but using filters, usually because someone incapable of admitting to a mistake turned the filter on on their phone once by accident and didn't notice and it's been on Sepia ever since, which they seem to think is just the way their camera works.
Engineer: it says image not to scale in the general notes, drawing view, and title block.
Also Engineer: Every God damned day...
Don't forget the "NOT FOR CONSTRUCTION" warning on the "working drawings"
oh trust me. ive seen a non for permit set get sent to peer review when it was supposed to be a client review. no one reads the “not for construction”
[deleted]
my favorite is that the company i work for is almost never the engineer of record for projects, we're just too expensive. so we build our solutions based on the drawings we get from the customer's architect / engineer.
then when it invariably has wrong crap in it, the customer always comes back at us, "it's in YOUR" submittal!"... yeah, based on your f*cked up architecturals.
Every. Gotdammnnn.Time
Cupertino?
nah, every municipal or hospital job where i'm at, over in the mid-west.
Plant maintenance guy told me once, "I dunno who the first engineer was but I bet you money that a mechanic fucked his wife. Because every engineer since him has made it their mission to fuck all mechanics."
😂😂
It's a female 4 block to male 3 block adapter
We're just going to need one of these so only order one full pallet of them since the majority are just going in the dumpster anyway.
Manufacturer minimum order for custom parts is a shipping container.
Manufacturer realized that they can charge more if every part is a custom part.
3 grams of epoxy resin.
EE Here.
I also feel this. Fuck other engineers. And me probably when something comes around again.
I try not to be that guy but everybody makes mistakes. And I don't have much feild experience.
I feel like that’s most of the problem with engineers. Without some field experience how will you know what works?
I rely heavily on others with more experience back checking and most of what I do is pretty disconnected from the physical world. I mostly program relays, come up with setpoints, do modeling, I don't select parts very often. And I try to be really careful when I do that connector a works with connector b and whatnot. I do have at least some feild and testing experience. Right now I'm testing (and building the tests) a distribution substation standard so we have a few panels set up in the lab. I'd kinda like to get involved with some more commissioning though. That's where I'm able to actually get out there. The big issue is when someone gets big headed about something, they become less cautious, and more likely to just be wrong and not accept the right solution.
I've got loads of field experience now. If anything, my drawings are "worse" than ever.
When I was green, I took way too much time to do my packages. Everything was immaculately drawn, every wire and device tag cross-referenced, every cable fully logged... And none of it was actually useful, because the reality of working in the field is that there's going to be massive changes to solve unexpected problems.
It's a waste of my time to draw up a beautiful cabinet layout and discover that it doesn't work at all because some piping that interferes with my glanding was added after the mechs gave me the assembly. Or because the civils held their floor plans upside down and ran the drop to the wrong side of the cabinet bank. Or because there's a bigass process sewer that doesn't appear on any prints and nobody knew about, right up until they broke into it while digging the trenching.
These days, my as-builts are beautiful. My RTCs are flexible. I rely on the electricians to actually talk to me and work with me so we can get a good solution. This really pisses off the folks who want a colour-by-numbers package, but if what we do were really that easy, we'd be hiring high school dropouts and running them through a shit cert instead of hiring red seals.
There's nothing like when an engineer specifies that receptacles should be installed with the ground facing up then the same engineer does a site walk and calls the electricians idiots for "putting the plugs in upside down".
Some people think doing that is better because with the ground at the bottom it looks like a smiley face and attracts kids.
I heard it was because you can drop a quarter (or a nickel) between the prongs when it's right-side-up.
Also because if the screw falls out of the metal plate, the plate can fall onto the prongs when plugging in or unplugging something.
Which I've never seen happen and that's what the breaker is for. Ifnit was a problem - it would be illegal. We got AFCI breakers for a dumber reason.
Engineer bad. Lectrian fix
Lmao. Electrical Engineering Intern here, man this is so true. I feel bad when ever this happens but remember the days when I was on the other side and bitched about them. Now I work with them and think, man if you knew what they said about you. 😈😂
[deleted]
Lmao.
That’s an RFI and a two extra tickets.
Engineer to illustrator: “Hey, what the hell is with these instructions you drew? Do I need a three stud or four?”
Illustrator: “Da fuq?! I very clearly drew a one by three stud to line up perfectly with three studs on the corner of...”
[Illustrator looks at final print of blueprints he’s never actually gotten to see, because fuck illustrators apparently. Smoke inexplicably begins to rise from his ears, brain burning with the fury of a thousand suns, raises his head and looks at the “Art Director” who hired him.]
Cheapskate Art Director that thought the illustrator’s carefully placed direction arrows weren’t big and red enough; who loaded the full resolution CMYK .psd file into MS Paint and slapped on some clip art all willy-nilly and saved the updated image to .jpeg instead of spending one more red cent for the illustrators time to make the changes properly:
“W... what are you guys looking at?”
Cheapskate Art Director: [promoted to Surgeon General of the United States or some shit]
All work to be completed to all codes, standards and regulations.
it sucks but do you know how large the construction -documents- sorry booklets would be for every applicable nfpa code.
I thought you were a licensed electrician?
no. plbg designer. work with electrical engineers and their plans for powering my things.
but putting comply to AHJ is alot easier than typing all the applicable NFPA codes (sprinkler and fire protection notes) to comply for dc vs md vs va vs nj
especially when different reviewers will interperet the same code differently.
Well, it's got to be.
What's a blueprint? (insert sarcasm)
cries in low voltage
cries in “no mo’ panel space”
God forbid we do the logical thing to correct said fuck up,
"it is shown per the drawings, refer to page A.202.2 for further clarification "
Two words: field verify.
Deign Engineer here. Deserve every word of it. Once our owner, managing partner and project manager charge to my job, I've got about two days to do a month design. Guess who else has this issue... Architect. People actually doing the work get about 20% of the hours we need to get it done. Gotta pay for all those meetings and office space.
In Canada it is the Electricians job to know and do everything about electrical work.
The Engineer is essentially a napkin artist.
same in U.S.
Slaps roof of building
You can fit so many change orders in this bad boy
Even better when they miss something and try to sneak it in a future revision without adding a cloud or even changing the keynote. Our company charges such extreme levels of "fuck you" money over shit like that, don't even try. It will hurt you.
We had a project manager drop off a set of revised prints about two weeks before we turned the building over to the customer with a bunch of added receptacles and e-net drops, they wanted it all in the block wall (which had been completed about a month or two earlier). Then lost their shit on us when we said we can do it but it won't be in the block.
I can do it in the block, but itll cost you about as much as this building.
We had a changeorder to add a bunch of security devices ina school. All block walls. We price it out. Not getting approved?? Hmm. Something is up. Find out the school board is negotiating a new contract for the security at all their buidings. They dont want to approve this yet untill their new contractor is awarded and they can give their 2 cents.
Every day more and more block is going up. We ask for them to approve the rough-in at least. The cableing can change very easily. No dice. All or nothing.
A few months pass and it finally is approved. Just as the blockies are demobilizing.
I turn to the general and tell him he will need to demo a shit ton of block now that it is approved.
He looks at me like im speaking a foreign language. That change order was approved. Thats in your scope.
I said our pricing was on new work. Working with the blockies. This is essentially remodle work. I just do pipe and wires. Im not chipping block for 3 weeks for free. We can ask for a change order but you know our costs will be too high. So let me know when yoh want to get a carpenter on it, ill tell him what he needs to do.
Haha
I have a set of prints for a job that's on hold right now. They want the exterior receptacles and data drops recessed in the wall. The pre-cast wall...
It can be done, but the cost is phenomenal, as it involves running a concrete saw crew for about 8 days, an engineer to verify the integrity of the concrete, reinforcements if it fails that test that cant stick out, etc.
And some precast company will not give you plans to show where the strands are because that is proprietary info.
Haha.
Right, start chipping away..
maaaaan, that is THE move this one EC i do work for tries, all the time.
"it's in the CB, so when will it be delivered?" is their first go-to move, to which i reply with a copy of the signed proposal and stamped submittal... "not in the scope, here's a CO for the added work", is my reply.
half the time the request just goes away, the other half they issue the CO after much crying.
the latest one was them kicking back a letter of warranty, saying "please correct to 5 year, per CB XYZ". standard warranty is 1 year, and they know it because it's on the damn proposal and subcontract. LoooooL
You do low tension?
Installers truly are the film critics of the construction world. Congrats, I guess?
That's just not nice
We're not carrying the cost of patching finished walls and extra material when it wasn't on the IFTs we quoted the job on, or any subsequent COs/revisions as an extra. When it suddenly appears in an area that's been finished for a while with no revision cloud and no explanation, yes the contractor will be upset and price to disincentivize that kind of thing.
What’s not nice is when architects and engineers that make way more money than we do, just forget to put things on prints and then the job is quoted/bid based on those prints, then they want a weeks worth of work done for free and with no drywall repair.
Can tell you architects and engineers don't get paid much, not until well into their careers. First 5-8 years the pay is shit.
It's the foremen I see with brand new trucks that are making the bank.
Sounds like the client doesn't want to pay for the changes in your case.
Hahaha! Oh that was a good laugh thanks
Can it fit over 400 Change orders because the project I’m on already has over 400 change orders!!! Its nineteen 4-24 unit apartment buildings/townhomes