G-fiber: time between line laying in neighborhood and availability in home?

Three to four weeks ago (early august), crews were laying Google fiber in my cul-de-sac. On the Google fiber site, it is still not available for my address. Does anyone have first hand experience with how long final availability takes?

I'm not dramatically and impatiently waiting since I already have gigabit fiber through at&t. (of which I've had surprisingly positive experiences with.) It would just be nice to save 30 bucks on my bill.

Sept 14 2020 edit: I was able to sign up!

Posted Sep 3, 2020, 2:40 PM UTC · edited

723
davidoffbeat•

I live in the Scottish Hills neighborhood and have been wondering the same thing.

  • I got a "coming soon" door tag from Google on June 29th

  • They were in my cul-de-sac digging on July 9th

  • I am still waiting/can't sign up yet

I did not have such good luck with ATT, the speed I got was terrible and installation was a nightmare. Luckily I canceled within 30 days (b/c I happened to get the google fiber door tag a week after I signed up for ATT)

So for now I'm still stuck on Spectrum and am getting very impatient.

1
SurfdudeboyOP•

So almost 2mo so far for you from the time of laying it in your neighborhood.

It sucks that at&t was a bust for you. :( Must be congested in your area. Good thing you were able to cancel in time.

I wish you luck with your wait for G-fiber!

1
davidoffbeat•

My install date is next week!

FYI I checked their website and saw I was able to sign up, never got an email or flyer or anything despite requesting info when it became available.

1
SurfdudeboyOP•

Same here!

2
davidoffbeat•

Utility company came and marked my yard last week....right before that huge downpour....hopefully they can still see everything okay and they don't hit a gas line...

1
moarcheezpleez•

I live off Two Creeks Rd and we were eligible in mid July. We got it installed early August. I can’t remember exactly when they dug but I think it was in early to mid June.

1
SurfdudeboyOP•

Okay, so for you the timeline is: dug in early/mid June, available online Mid July, and installed in early august.

Thanks!

1
davidoffbeat•

Dang, you're right up the street...hopefully I get mine soon!

1
SurfdudeboyOP•

I'm just a bit north on the other side of Maynard, so it seems like it's slowly moving up north from the south.

1
davidoffbeat•

I've seen them actually digging on Maynard first near High House and now further up towards James Jackson etc. Makes me wonder if theres some big "hub" connection they need to make

1
ApachePrime•

I have a similar timeline to someone below, Coming Soon in late June, lots of digging and trucks.

I have an appointment for Saturday for the final installation. They're moving slow, but it's better than Never.

1
SurfdudeboyOP•

Thanks for sharing!

1
[deleted]•

[deleted]

1
PleasantDifficulty•

AT&T increased my rate from $70 to $100 at the end of August after my one year was up, I called them and got it back down to $70 again. Then I asked for a credit for the outage on the 21st and got $5 for that. I mentioned Google had just laid fiber in my neighborhood.

1
InvincibleAlex•

Have you gotten the hang tab on your door yet? It took almost 4-5 months for the service to finally switch on in my neighborhood. I’m between Apex and Cary.

1
SurfdudeboyOP•

Yes.

1
drnatewhims•

Depends on the neighborhood and how far the lines have been installed in nearby main roads. I have had several friends take about a week from lines getting laid on their street before they got service. My neighborhood took about 6 months

1
Bearcat1522•

They laid the fiber lines back in April/May. I was able to sign up at the beginning of August (and did). It’s been wonderful compared to Spectrum.

1
Wizard_of_Wake•

Did they put in conduit (orange) or fibre (black)?

1
IOnlyEatFermions•

I live near Trinity Rd. Last year got the door tag in early October. They had brought the fiber into the front of the neighborhood in April, accidentally cut AT&T's fiber, then vanished. Google's contractor micro-trenched the neighborhood in mid-October. Got fiber layed from the curb to my house and the outdoor box installed in mid-December. Final install on December 26.

1
GiantsInTornado•

Took almost two years for them to make it available in our neighborhood after they put in the fiber. So expect the same unless their turn around time on it is faster now.

1
SurfdudeboyOP•

I have an installation appointment next week. I think there was some problem that stopped/slowed their deployment 2ish years ago and only recently has it picked back up.

1
shares•

It's "available" at my address except the cable was damaged during street repaving. It's been weeks, and calling to ask is like calling any other utility. I have to inform them their records are wrong - here's the situation, when will it be fixed. And it's been a month.

1
Caswell64•

Back when I lived in Raleigh, I had a Google Fiber jack for TWO YEARS installed in my apartment that they never hooked up or acknowledged. When I finally moved out they still had done nothing.

At my house now in Cary near downtown, I got the flyer on my door and the construction crew dug up the edges of the street a month or two ago to lay fiber. Still no word from Google, and I have zero confidence in them to actually finish the job.

0