Comparing 2 quotes in San Diego. Trying to get solar before NEM3

Advice Wtd / Project

Comparing Quotes

I’m in San Diego, CA. Last year, my annual energy use was 14000 kWh. Single family house of 1300 sq ft and about to finish adding 2 ADUs this month. Panels would be installed on one of the ADUs (19) and on the main house(5-8 too much shade and weird roof design).

Quote 1

total cost before tax incentives: $34k system size: 10.13kW estimated annual solar production: 14,966 panels: 27 LG 375Wpanels microinverters: solar edge single inverter w/power optimizers electrical panel upgrade: yes warranty: solarinsure 30yr warranty

Quote 2

total cost before tax incentives: $33.5k system size: 9.12 kW estimated annual solar production: 12000 panels: 24 Silfab SIL-380 bk microinverters: solar edge se760h electrical panel upgrade: yes Workship warranty: 15yr Panel warranty 25 yr.

I would take a 12 loan for both using my credit would be $220 a month.

Posted Jan 19, 2022, 10:19 PM UTC

526
revealmoi•

Get prices for both w zero loans. Ask for cash price.

You’re not seeing the true price.

Both systems are slightly high $ but probably because of the loan.

3
Radio_LabOP•

I know what you're saying about the loan included price but they both basically quoted loan and cash the same.

I had other cash quotes from other companies but didn't like their panels.

The loan fee from the bank or credit union makes the cash prices pretty similar if I finance it myself.

1
revealmoi•

I think your project should be south of $3/watt. I think you’d be fine w qcells 400 or Jinko 395 both modules are readily available in your area. Take the savings.

Those 2 quotes are at the upper bound of fair maybe just outside the bounds.

1
Radio_LabOP•

Thanks for your insight, I really appreciate it!

1
revealmoi•

Write again when you’ve rcvd a third proposal. Ask the other 2 to consider. re-quoting w qcells or Jinko.

W the new ADUs being unknown I recommend you maximize capacity to extent space and budget allow. More capacity and lower cost to build will yield best outcome

1
Generate_Positive•

For San Diego with an MPU and arrays on two different buildings I would consider these fair prices for this quality of equipment. Assuming these are Silfab Elite, I like that panel a lot. Great value, warranties, aesthetic, and the back contact tech is rather smart.

What’s the inverter size on quote 1? Quote 2 I’d consider upsizing the inverter to allow for a bit more future expansion.

With an MPU and NEM3 right around the corner you‘ll be well served to get started ASAP. SDGE service orders take a long time! What‘s your existing electrical? Any chance of a sub vs an MPU? That may be an option depending on your existing electrical

1
hayhayhayday•

First one is cheaper and has longer third-party backed warranty. Are they connecting all to one inverter would the adu and main house have separate inverters?

1
Radio_LabOP•

I'm sorry I'm not entirely sure but they would try to route it through the ADU panel to the main house.

1
shesonastride•

Does option one come with anything beside the warranty. Everyone has a warranty it is typically a manufacturer pass along.

Regardless 1 is better than 2 but you could probably do better value for that price.

Option 2 you will have a true up each year that will keep increasing. Don't do it. I would ask for another panel on option 1 if you are dead set on these two companies.

1
[deleted]•

[removed]

1
AutoModeratorMOD•

This comment has been removed. From the sub rules: "Due to ongoing spam / promotion / lead generation and site privacy rule violation issues, we no longer allow "DM/PM me" requests in the comments." These have too frequently been abuse of the sub in attempts to garner private info for spam / promotion / lead generation purposes. Do not ask or suggest that anyone privately contact you. No exceptions.

To all sub participants: If anyone has sent you a PM / DM to solicit your info because of your participation in this subreddit 1) do NOT respond to them and 2) please message the moderators to let them know.

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

1

We could do $33,769 if you have normal shingle, for 27x LG 375W panels and a main panel upgrade using Solaredge. So I'd say those are both fairly competitive

1

Sorry I meant $32,769

1
Radio_LabOP•

Thanks for your perspective! That helps a lot

1
matty8199•

I don't think there's any way you're getting in before NEM 3.0. IIRC it will be based on what is in effect when your system is turned on / given PTO, not when you sign the purchase agreement...

1
Radio_LabOP•

https://www.kpbs.org/news/local/2022/01/20/big-decision-rooftop-solar-california-off-table-for-now

It looks like it getting pushed back so hopefully I get it installed in time

2
hlurbwclb•

Dm me, would love to know who you are working with in the SD area and see if we can get you a lower cost!

1