r/Autobody•
BryanRex

CCCOne Floor Plan

Anyone out there have any good examples of a 'floor plan' in CCC that isn't super awkward to work with?

I'd be really happy with anyone's examples of repair phases that work well too.

I over engineered mine, and they're just too cumbersome for some people to use well.

Posted Feb 15, 2022, 3:47 PM UTC

15
Saint_Chrispy1Journeyman Technician•

My shop uses CCC but the techs don't bother with the cycle part. Granted we are small shop so it's not entirely vital to us. But I can dm you a link if you would like to see how my office people set ours up.

2
BryanRexOP•

I would love that. Thank you! Even if our shops run at different capacities there could be some good tidbits in any extra info.

I'm always trying to figure out the best way to keep everyone in the loop. I average about 120 cars actively at the shop at any given moment so just saving a minute per vehicle update gives me 2 hours of time to put out extra fires.

1
gingeravenger087•

Best advice I ever got from CCC is to number your phases. That way you can sort by number in your production schedule which will let you identify swiftly your WIP.

like Disassembly/Blueprint is number 01, Waiting on Parts is 02 etc etc etc

The floorplan thing always seemed clunky and extra work to me.

2
BryanRexOP•

Agreed, it's definitely clunky but it's pretty nice if you get it all in order (easier said than done).

You're absolutely right about numbering the phases. I actually use an alphanumeric system. Like; C1.0 Prime/Prep, C1.1 Ready for Paint, C1.2 Paint in Process...

Then I can sort filter the phases by "C1" and print by painter to see everything relevant for lining up their work.

At least that's what I'm trying to make happen. Frankly it's way easier to just use Trello and have a fully drag and drop kanban board for me and the techs to sort.

The one thing I do like about the floor plan is that I can have just the few paint phases but drag the vehicles into the Paint Monday AM, Paint Monday PM... boxes and my estimators and techs can see where their vehicles are in the line up without having to sift through a ton of notes.

2
gingeravenger087•

We use little tech/team kanban boards in their stalls and the production schedule for everyone else. It works. Nice about Trello. May try that out.

1