Qualified flood restoration tech here. Remove skirting and gib/lining up 300mm. Inspect and dry structure. Do the same on the other side of the wall, so you can see the damage behind the shower too
Inspect subfloor for water damage and moisture. Remove floor coverings. Be careful for old asbestos floor covering or glued down backing residues.
It's not going to be cheap. It will vary depending where you are located.
If the liner is bubbling then I think you already know that the water is already behind it. Expect rot in the wall and floor (if it's timber).
There's probably a weeks work there. A day stripping and propping. A day reframing and lining the wall. Gib stopper, paint etc. Then the shower needs to go in and the plumber needs to hook it all up.
Then the floor needs to be added in if it's timber, it's probably rotten. If it's concrete it needs professionally dried. (I'd use Jaes but I'm biased) And then the floor needs relined.
It's going to be expensive. If you have the money I'd refit the entire bathroom so it's no longer a worry.
When choosing a contractor my recommendation is to go to your local supply store eg bunnings carter's placemakers or mitre 10 and ask who they'd recommend. Get quotes from multiple contractors. When they're there supply coffee and snacks and youll be surprised how much more they'll do for less.
Qualified flood restoration tech here. Remove skirting and gib/lining up 300mm. Inspect and dry structure. Do the same on the other side of the wall, so you can see the damage behind the shower too
Inspect subfloor for water damage and moisture. Remove floor coverings. Be careful for old asbestos floor covering or glued down backing residues.
Replace any damaged materials after drying.
Make sure to fix the shower too.
I suspect we need to redo the shower liner, as it has a bunch of bubbles, so at least we should be able to dry it from the inside of the bathroom.
Any ballparks for the cost to do this professionally?
It's not going to be cheap. It will vary depending where you are located.
If the liner is bubbling then I think you already know that the water is already behind it. Expect rot in the wall and floor (if it's timber).
There's probably a weeks work there. A day stripping and propping. A day reframing and lining the wall. Gib stopper, paint etc. Then the shower needs to go in and the plumber needs to hook it all up.
Then the floor needs to be added in if it's timber, it's probably rotten. If it's concrete it needs professionally dried. (I'd use Jaes but I'm biased) And then the floor needs relined.
It's going to be expensive. If you have the money I'd refit the entire bathroom so it's no longer a worry.
When choosing a contractor my recommendation is to go to your local supply store eg bunnings carter's placemakers or mitre 10 and ask who they'd recommend. Get quotes from multiple contractors. When they're there supply coffee and snacks and youll be surprised how much more they'll do for less.
Hope this helps. Feel free to ask any questions
Yeah, that really helpful, thanks heaps!