contract selection. when what and why?
Hi I am a PQS, quick one. any guidance out there on when to select the appropriate contract for the type or works/tendering type being used. ie jct SBC with quants, without quants, approximate quants, measured term, minor works, design and build, nec contracts, etc etc.
Posted Jul 4, 2022, 8:08 AM UTC
31
Checkout Contract Practise on Isurv. Or any of the revision material floating around for it.