Question about Bell Fibre Installation
Hi Everyone,
I live in a neighbourhood that has Bell fibre construction underway. Every house has a handhole on the front lawn and a fibre runs up to the house in a buried 3/4" flex conduit. The fibre is looped at the power meter, ready for installation by a Bell technician.
When a customer signs up for Fibre services, what method does the technician use to install the fibre into the house?
- Do they use a slack box for the excess cable and terminate the cable outside?
- Or do they skip the slack box altogether and directly feed the fibre inside for termination?
Since the cable is run in a conduit up to my house, I'd like to take some extra steps to protect the fibre and clean up the wiring on the side of the house.
Ideally, I'd like to drill a hole for the conduit myself and install an L Adapter to feed the conduit inside (something like this)
I'm just not sure if Bell would approve this type of installation.
Thanks
Posted Aug 5, 2022, 4:18 AM UTC
Slack box on the outside. If you have a hole done the tech will love it. You can definitely use that type of conduit.
Good to know, thanks! I think I'll drill the hole, but hold off on piecing everything together until the tech arrives as it sounds like I'll need to accomodate the slack box.