Power line capacity and grid stability
Right now in Sweden, like in most of Europe there's a big debate about energy, and one of the points of contention is the large difference in electricity prices within the country itself. This is explained by energy production being localised and having limited transfer capacity.
In the last few years a large high voltage DC power line was completed that was meant to alleviate this problem, however despite a huge imbalance in electricity prices this link runs at about half capacity. This has been explained by a need for safety margins in the grid, due to insufficient predictable energy production in the south.
My question is how this affects the transfer capacity in concrete terms. Why do you need a lot of local production to safely import power? Is it because in this case the link is DC?
I understand the concept of balancing the grid, but not why it has to be local. Which distance scale is "local" in this case and why?
Posted Aug 29, 2022, 11:29 AM UTC
It might be N-1 contingency. I assume that it uses atleast 2 circuit line. If the DC link uses radial configuration, since if any sudden outage or maintenance the one of the line might be loaded with 100 percent capacity.