11Sparkey

u/11Sparkey


r/electricians•

Hi there, just looking for some advice. Commercial customer has a utility layout for an 800 amp 3 phase 120/208v overhead service. Seems crazy to me to not go underground but utility has confirmed overhead is acceptable. Parallel aluminum 400 kcmil quadplex or 1000kcmil if that exists? Any help much appreciated.

211

r/electricians•

Hi sparkles, I'm doing a 200a panel upgrade for a customer. The meter is on a pole out in a field. I need to run 4/0 al overhead across a driveway to the mast. From the mast to the panel is about 40' of 1.25" PVC with a bunch of LBs, bends and 90s that I'd rather not change and just run 2/0 hots with a #6 neutral as allowed by the a recent code bulletin. What connector should I use for the 4/0al to the 2/0 and #6 cu? Any advice much appreciated.

12

r/airstream•

Hi, I'm working on a 1971 international and the univolt is only outputting 8v. I'm thinking it needs replacement. I don't need a charger, always connecting to 120v. Can anyone recommend a good replacement that is available in Canada? Thanks for any help.

11


You've reached the end of this feed.