Bought a house with unfinished basement that had the vent/drains roughed in through the concrete.
I foolishly framed without making any bathroom measurement considrations and figured common sense would be to frame the vent stack centered on my 2x6s.
However, now that I'm working in the bathroom I've found that my drywall stud to drywall stud measurement is 58".
This is causing two issues:
-
My toilet is only 11" from stud to CL instead of the ~12.5" I would need to have a finished measurement of 12".
-
60" shower pans dont fit, so I will have to with a custom pan which will greatly increase my cost.
The issue I'm facing is that if I move that wall 2 inches horizontally, that vent sta