I have a sloped lot with a long deck across the back of the house. It is attached one side to a ledger and the far side supported by a beam supported by 6 10' tall 4x6s sitting on concrete footings. All for about 30 years.
Two of the 4x6s are showing some rot on the bottom. I'm thinking I can replace about 6" of wood by splicing it with 2x4s on either side and bolts through.
This is all complicated by the fact that there is a workshop built under the deck that also uses these supports for its structure making shoring up from the ground difficult.
The plan was:
- Cut 6" off the bottom to remove the rotted wood and replace with new wood from a new in-ground pressure treated 2x6. This is th