pipechap
u/pipechap
I recently bought a house built in 1996 and found that the HVAC system isn't configured the way the inspection initially led me to believe.
The existing equipment is:
Condenser unit: 2019 Lennox R-410A
Indoor evaporator coil: March 1996 manufactured Trane TXC043C4HPB1
The indoor coil is specifically labeled “Refrigerant 22 Only”
Furnace/indoor equipment also appears to be original to the house
The seller told me that when the AC was repaired/replaced, only the outdoor unit was changed and the HVAC company never went into the attic. An HVAC company I later contacted confirmed that the indoor equipment is still original.
The system does currently cool. The home inspection measured rou
Kickstarter relaunch for G757 Inspired case for AE1200 coming soon
kickstarter.com/projects/q1200casioae1200kit/...Kickstarter relaunch for G757 Inspired case for AE1200 coming soon
kickstarter.com/projects/q1200casioae1200kit/...I’m trying to reproduce the factory mounting hole pattern for the rear GT decklid emblem on a 2015–2017 Mustang GT, the decklid panel that came on my car was cracked and broken so I replaced it with an undrilled one.
I'm looking for either:
- an installation PDF with a drill template
- measurements for the four mounting holes
- center-to-center spacing between the four emblem posts
- recommended hole diameter(s)
I'm ultimately using the factory hole pattern to design a custom badge using the existing mounting holes, so I’d like to keep the decklid completely reversible in case I want to install a stock GT badge, and avoid drilling anything incorrectly.
Thanks!
I’m trying to reproduce the factory mounting hole pattern for the rear GT decklid emblem on a 2015–2017 Mustang GT, the decklid panel that came on my car was cracked and broken so I replaced it with an undrilled one.
I'm looking for either:
- an installation PDF with a drill template
- measurements for the four mounting holes
- center-to-center spacing between the four emblem posts
- recommended hole diameter(s)
I'm ultimately using the factory hole pattern to design a custom badge using the existing mounting holes, so I’d like to keep the decklid completely reversible in case I want to install a stock GT badge, and avoid drilling anything incorrectly.
Thanks!
I searched around this sub and some others related to tritium, and didn't find any solid sources for watch dials and watch hands that can hold a tritium vial to use as indices, anyone know of a source?
I was just told by one of my engineering friends that a job he interviewed for had him complete a test (pdf format, which I've seen) in 2 hours, that contained what was essentially a 9 question version of the FE exam.
How common is this in industry? I'd never heard about this before but another engineering friend is saying this isn't uncommon in smaller companies where multiple candidates are being considered.
I'm working with a fiber-coupled nitrogen laser operating at 337.1 nm, delivering nanosecond pulses through a ~600 µm core with a numerical aperture of approximately 0.22. The beam is being prepared for use in a UV imaging application where maintaining beam shape and alignment is important, though average power is low.
I'm trying to identify a suitable fused silica collimating lens that pairs well with this wavelength and NA. The goal is to achieve clean, stable collimation from the fiber output without compromising transmission or introducing unnecessary aberrations.
The goal is to collimate the beam from the fiber and then focus it to a spot size around 160 µm. If anyone has experience s
Once you remove the glass, remove the bayer filter on an image sensor, how do you reattach the glass?
Using heat to remove it is great since it removes the glass in one piece, but how do you remove the epoxy residue, and what epoxy do you use to reattach the glass to the sensor?


