r/Flooring•
Orpheums

Order of operations question

I have a house in the PNW and am redoing the concrete basement flooring. I dont think there are any moisture issues, however i want to install preventative measures regardless because i would prefer to buy once and not touch the flooring again. I am thinking that for the flooring i would install layers in this order:

Drylock (or redguard, or bone dry???) Self leveling agent Dricore (https://www.homedepot.com/p/DRICORE-23-25-in-x-47-25-in-x-1-in-Premium-Subfloor-Specialty-Panel-10-Pack-FG10038/316351887) 6mil sheeting Laminate planks

My thoughts for this is the drylok would prevent some moisture from getting up through, and any that did get up would be allowed to evaporate due to the dricore. The 6mil plastic would protect the flooring itself from any of the moisture that got through. I want to prevent as much moisture as possible from getting through, and addtionally make sure that any moisture that does comes up from the flooring would not get trapped and grow mold.

Thoughts on this plan? Possible overkill or misapplication/mis ordering of layers?

Posted Jul 8, 2025, 9:43 PM UTC

35

Comments aren't archived yet

This post had 5 comments on Reddit. Comments for this period haven't been loaded into the archive yet.