Orpheums
u/Orpheums
I have a house in the PNW and am redoing the concrete basement flooring. I dont think there are any moisture issues, however i want to install preventative measures regardless because i would prefer to buy once and not touch the flooring again. I am thinking that for the flooring i would install layers in this order:
Drylock (or redguard, or bone dry???) Self leveling agent Dricore (https://www.homedepot.com/p/DRICORE-23-25-in-x-47-25-in-x-1-in-Premium-Subfloor-Specialty-Panel-10-Pack-FG10038/316351887) 6mil sheeting Laminate planks
My thoughts for this is the drylok would prevent some moisture from getting up through, and any that did get up would be allowed to evaporate due to the dric
Hey there, i am wondering if these are a good prices for a high end prebuilds? https://seattlebuilt.com/precons/#tier3
I want to get a higher end PC but i dont really have the mental bandwidth to deal with figuring out how to build one myself at this point. Based on typing in the parts from theit highest end one it seems like they are only charging around 200 bucks to order and build the PC?

