Pipe replacement works properly now
Not sure when this happened (if I missed it in patch notes or on here) but replacing pipes with the same type but different material (ie igneous rock insulated pipe -> ceramic insulated pipe) works properly now, plus, it also properly sets priority from the build menu instead of setting it to 5 for the replacement pipes
Slightly related, but I don't remember if the pipe overlay would usually let you see replacements on its screen, but it doesn't right now. Not sure if a change or just how its always been.
Posted Dec 2, 2019, 1:46 AM UTC
that is good to know, need to replace with normal pipe, and then replace with insulated pipe with other materials!