I am trying to create an Area Schedule with a calculated parameter that only returns a Percent of the Whole Area when a Yes/No parameter is checked.
So I've got my standard [Area] Parameter as SF, a [Yes/No] Parameter assigned to my Areas, a Calculated Value for the Schedule as a Percentage of [Area] / <Grand Total>, and I'm trying to combine these together into something along the lines of:
=IF ([Area - UAP Affordable]), [percent of total], )
See screenshot here for context.
However whether using a percent such as "0%" or value such as "0 SF" or text such as "NA" for my boolean <result-if-false>, I keep getting the error "Inconsistent Units."