The 3 week parallel bus service for LRT is a horrible idea. It's giving everyone a bad first impression of the new LRT + connecting bus system.
The rationale behind it is admirable, an insurance policy in case the LRT breaks down majorly during the opening weeks. But here's the thing, the whole point of LRT is to eliminate buses downtown, and to have buses connect at the ends of the line + hurdman mostly. This solves the 2 major problems with the old buses.
1: Super long routes like the 45 km route 95 that constantly get delayed because of how long it is. Small delays add up. Delays in Orleans and downtown will affect your bus from Algonquin to Barrhaven.
2: Buses get stuck in traffic downtown, causing massive delays across the city. A bus stuck in downtown will delay your bus from Blair to Orleans.
LRT solves both of these because LRT is separated from traffic, and breaks up routes on all sides of the line. The 45 km 95 becomes an 11 km route 39 (34 km shorter) and a 20 km route 75 (25 km shorter). This is happening with all the major buses. Shorter, more frequent buses that are separated from traffic. This is the major advantage of the LRT system with respect to the new bus network.
Here's where OC Transpo fucked up. We don't have that system yet. We have a brand new beautiful LRT, with the old shitty bus system. We don't have any of those benefits yet. Buses still get delayed through downtown, causing ripple effects of delays across the city.
Here's a specific example. You take the LRT from Parliament to Blair. You're expecting the 95 to Orleans to be on time, but it isn't. Because it's stuck in downtown traffic, and when it shows up it'll be half full already. With the new system, the 95 (39) starts at Blair, so it's empty and always on time. This is why the parallel bus service is really a disservice. These issues are amplified at Tunney's, because of the parallel bus service.
This is especially horrible because everyone's first impression i that the combined LRT + bus system is a bad one. Look at all the complaints about Tunney's Pasture and Blair being a shitshow. It is a shitshow! Specifically because we are using the old bus network, instead of the new network designed for LRT.
Everyone is having a great first impression of the LRT itself, and a bad first impression of the combined LRT + connecting bus system. Specifically because of the parallel bus service. It's giving an inaccurate, negative impression of what life will be like with LRT.
Edit: Thanks for the gold! :)
Posted Sep 17, 2019, 11:59 PM UTC · edited
The 3 week parallel service is to help people adjust and would ensure that the sky wouldn't fall if the LRT had issues.
It's a bit late to change now.
Another sub thought: They should advise supervisors that if they need trips to be covered, they could shorten a trip's service to an LRT station instead.
Would avoid any cancellations and make up for the crappy service we've had during the construction of LRT.
Can you give an example of this with specific routes? I'm having trouble imagining how this would work. I want to understand this.
Ex 1. Instead of cancelling an important trip such as 268 Kanata during rush hour. They would just tell a 97 to end at Hurdman instead of Tunney's Pasture.
Ex 2. If a 129 is already late leaving La Cite, they would call in and tell the driver to finish at Blair. And do an Orleans-bound route that is already at risk of being cancelled or extremely late.
Because of interlining, it's not quite that simple
That would require the union being on board since it would extend routes when a driver might be off or on break.
They already cancel by level of importance, and can cancel partial trips.
3 weeks though? It should be one week max.
Or at least, all Express buses should end/start at blair/tunneys in week 2
Honestly, if anybody remembers the Rapibus deployment fiasco in Gatineau, it's a good idea in a sense, but the temporary nature needs to be advertised.
The STO did not have the ressources to run parallel service. The Rapibus launch was a fiasco for many reasons, one of them being that it's run by a budget service with little ressources.
It's like we've learned nothing from completely switching off one system and a new one on, with no parallel gradual integration.
I know. Literally the first sentence of my post.
How many people do you think came out to try LRT for the first time? As in, people who aren't existing transit riders. They will be permanently turned off from transit because of these negative experiences. Some people may even start driving. Think of the hundreds of posts/comments saying "It's going to add transfers, LRT sucks".
I know. I'm saying why it's a bad idea. It's important to recognize that. It's super important to let people know that the parallel bus service is making transit worse right now, and that the first 3 weeks of LRT service are not representative of what the system will actually be like. It's giving an unfair, negative impression of the system. This could hurt the long term ridership of LRT. It's a very costly mistake. We only have one chance to launch the system, and we need a good first impression. Unfortunately, that didn't happen. Not for the LRT + connecting bus system.
So having the regular bus service overlap for an extremely short period of time as an insurance is a horrible idea? I'm curious in your mind what a good idea would be and how it would solve the issue of transporting rush hour people if by any chance the lrt not functioning during these critical few weeks.
Did you read my post though? I explained thoroughly why it's a bad idea. As for train issues, just send replacement bus service. You can have extra busses on standby specifically for the first few launch weeks, and send R1 replacement service or make them 95's, 61's, etc...
It's very unlikely we'd have a catastrophic failure. Most issues can be solved within minutes. More serious issues that take out one half of the line, can still be dealt with by running trains in both directions using 1 set of tracks. You can combine that with replacement bus service if needed. There are plenty of alternatives besides fucking over the entire system with shitty transit service for the first 3 weeks of service, giving everyone a bad impression.
I think things like "fucking over the entire system" and "permanently turned off" are a bit extreme and rather unrealistic.
If there was a sudden heavy increase in the number of busses affecting traffic, people could be frustrated with that; that didn't happen. Drivers and Pedestrians will see the same traffic level that they have been seeing for years. If the trains added to the traffic then you might have a point, but it's a separate system and the only increase you'll see is pedestrians being more dense around the stations.
Further to that, in a couple of weeks those extra busses are gone. You make it sound like people will be "Oh well it's too late now! I hate it!", but people are more flexible than that. Once the downtown traffic is reduced people will be enjoying the benefit of it and not "permanently turned off" because the busses that have been running for years still had to run for a couple of weeks.