September 2018, WIYH?
Acceptable top level responses to this post:
- What are you currently running? (software and/or hardware.)
- What are you planning to deploy in the near future? (software and/or hardware.)
- Any new hardware you want to show.
Previous WIYH:
View all previous megaposts here!
Happy weekend y'all~~
Posted Sep 15, 2018, 7:01 PM UTC
Currently running under ESXi 6.5:
Configured, on standby:
Misc. running:
Misc. not running:
Buying parts for:
A few weeks ago I bought, configured and installed Brocade ICX6610 (1/10/40GbE) and ICX6450 (1/10GbE) switches, along with 4x Mellanox 10GbE and 2x Mellanox 40GbE HCAs, all connected via DAC. I'm slowly transferring all networking from a fully populated Nortel 5520 over to the Brocades, and moving all 13 cams to their own server and subnet. At the same time all servers have been moved to 10 or 40GbE and ESXi re-configured so that moving VMs around is much faster than before... Still need SSDs to replace all spinners but the cost is too high at the moment.
Next up is moving everything to ESXi 6.7 and talking myself into a second VMUG license after I try Proxmox.
https://i.imgur.com/jD0hNKJ.jpg
/e: typos
That is insane bro.
This guy homelabs.
Can you expand on the r pi as a lightning detector? What is that setup?
Here ya go:
https://shop.switchdoc.com/collections/weather
I've a Davis weather station online for years; the lightning detector will make for a nice upgrade.
Any automation? Like automatically shutting down non-critical systems when a strike is less than 5 miles away?
The thought has crossed my mind. This step is to find out how accurate it is, and to get the notifications in place. I'd be happy if it can tell me when a cluster of high density strikes is closing fast; Plan A is to (i) run out to the power pole and trip the breaker, separating me from the 2 miles of aerial copper conductor run perpendicular to the normal storm track, (ii) run to the shop and trip the incoming 70A breaker, (iii) run back to the house and trip the incoming 200A breaker, (iv) initiate orderly shutdown of UPS clients. This can be done in 5-6 minutes, with 5 dogs barking in the background as dead UPS beeps argue for attention with a whole bunch of holyfuckthunder.